| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 LAccepted-AOC EDAVANNUR P O KANNUR | KANNUR | KANNUR | KERALA | L1 | Accepted-AOC Lowest bidder.Accepted | |
| 2 | L2₹65.1 L+₹3.2 L (5.09%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | VIJESH. K L1 | ISMAIL M K L2 |
|---|---|---|---|---|---|
| 1.00Appendix A Boat Jetty Sub Structure | |||||
| 1.00 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 10.65 | MT | 1,24,628.37 ₹13,27,042.88 Lowest | 1,30,839.96 ₹13,93,183.89 |
| 1.00 | OD29889/2024-2025:Bored cast-in-situ M30 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-600 mm including chipping and removing extra length of RCC pile as per the direction of departmental officers at site | 264 | metre | 5,438.31 ₹14,35,713.84 Lowest | 5,709.36 ₹15,07,271.04 |
| 2.00APPENDIX B - Boat Jetty Super Structure | |||||
| 2.00 | OD29893/2024-2025::Providing floating plat form of size 12m x 7m (as per drawing)on pontoon in steel
work riveted or bolted in built up section etc., trusses and framed work M.S angle, iron plates, tees etc.
straightening cutting, fabricating and hosting including applying one coat iron primer for pontoon including
cost of materials, labour charges, mobilisation charges, current charges for welding etc. hire for winch,
chain, hook etc. and launching in to the river and all other incidental charges including lighting etc. complete
for piling in river portion. | 264 | metre | 1,228.8 ₹3,24,403.2 Lowest | 1,290.04 ₹3,40,570.56 |
| 2.00 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 15.6 | cum | 9,584.27 ₹1,49,552.95 Lowest | 10,061.95 ₹1,57,006.67 |
| 2.00 | 20.9:Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | 1 | per test | 1,084.42 ₹1,084.42 Lowest | 1,138.47 ₹1,138.47 |
| 2.00 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 1.7 | cum | 11,374.89 ₹19,291.81 Lowest | 11,941.83 ₹20,253.34 |
| 2.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.23 | cum | 11,830.88 ₹38,237.4 Lowest | 12,420.54 ₹40,143.19 |
| 2.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 13,020.6 | kilogram | 98.95 ₹12,88,387.97 Lowest | 103.88 ₹13,52,579.51 |
Tender Value
₹65.8 L
EMD Value
₹50,000
Closing Date
21 Aug 2025, 3:00 pmClosed
Executive Engineer,IN Division,Kannur
O/o the Executive Engineer, Inland Navigation Division, Kannur 2
LAC-ADS-MLA-ADS-CONSTRUCTION OF BOAT JETTY AT AZHEEKKAL.-General Civil Work
2025_Irrig_786744_1
IRR/KP/TR/216/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Azheekkal
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
21 Oct 2025
14 Aug 2025
23 Aug 2025
14 Aug 2025
21 Aug 2025
14 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1293610.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .