| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC 19 PAOTA C ROAD JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹40.7 L Quoted ₹42.4 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹43.1 L+₹70,275 (1.66%)Rejected-AOC 00 BAJRANG CHOK MAHOBA MAHOBA UTTAR PRADESH 210427 | MAHOBA | UTTAR PRADESH | 210427 | ₹43.1 L+₹70,275 (1.66%) | L2 | Rejected-AOC Not Lowest Bidder |
| 3 | L3₹43.2 L+₹84,995 (2.01%)Rejected-AOC | ₹43.2 L+₹84,995 (2.01%) | L3 | Rejected-AOC Not Lowest Bidder |
| 4 | L4₹43.5 L+₹1.2 L (2.78%)Rejected-AOC PLOT NO 19 PAOTA C 3RD ROAD JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | ₹43.5 L+₹1.2 L (2.78%) | L4 | Rejected-AOC Not Lowest Bidder |
| 5 | L5₹45.0 L+₹2.6 L (6.20%)Rejected-AOC | ₹45.0 L+₹2.6 L (6.20%) | L5 | Rejected-AOC Not Lowest Bidder |
| Sl No | Description | Qty | Unit | Rajendra Engineering Works L1 | m/s vikas construction co. L5 | BEYLIM INFRA L7 | SANJOLI CONSTRUCTION COMPANY L6 | Achal Sales L8 | New Vishvakarma Udhyog L4 | HINDUSTAN TRADING COMPANY L2 | M/S SUA DEVI L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in hard/dense soil/rocks, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 15 | CUM | 580 ₹8,700 | 600 ₹9,000 | 565 ₹8,475 | 151 ₹2,265 Lowest | 650 ₹9,750 | 380 ₹5,700 | 375 ₹5,625 | 400 ₹6,000 |
| 2.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 12 | CUM | 140 ₹1,680 | 150 ₹1,800 | 160 ₹1,920 | 81 ₹972 Lowest | 180 ₹2,160 | 130 ₹1,560 | 120 ₹1,440 | 130 ₹1,560 |
| 3.00 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 3 | CUM | 280 ₹840 | 285 ₹855 | 300 ₹900 | 81 ₹243 Lowest | 340 ₹1,020 | 250 ₹750 | 200 ₹600 | 150 ₹450 |
| 4.00 | Taking up or down 15mm bore galvanised steel water tubing including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. Note :-Excavation and earthwork shall be measured and paid for separately | 550 | RM | 25 ₹13,750 | 27 ₹14,850 | 30 ₹16,500 | 11 ₹6,050 Lowest | 28 ₹15,400 | 23 ₹12,650 | 30 ₹16,500 | 15 ₹8,250 |
| 5.00 | All as per Srl item No 4 above but 20 mm dia bore. | 780 | RM | 25 ₹19,500 | 27 ₹21,060 | 30 ₹23,400 | 15 ₹11,700 Lowest | 28 ₹21,840 | 23 ₹17,940 | 31 ₹24,180 | 15 ₹11,700 Lowest |
| 6.00 | All as per Srl item No 4 above but 25 mm dia bore. | 500 | RM | 25 ₹12,500 | 27 ₹13,500 | 30 ₹15,000 | 18 ₹9,000 | 35 ₹17,500 | 24 ₹12,000 | 33 ₹16,500 | 15 ₹7,500 Lowest |
| 7.00 | All as per Srl item No 4 above but 40 mm dia bore. | 370 | RM | 35 ₹12,950 | 30 ₹11,100 | 32 ₹11,840 | 21 ₹7,770 | 37 ₹13,690 | 27 ₹9,990 | 35 ₹12,950 | 15 ₹5,550 Lowest |
| 8.00 | All as per Srl item No 4 above but 50 mm dia bore. | 250 | RM | 40 ₹10,000 | 35 ₹8,750 | 37 ₹9,250 | 30 ₹7,500 | 50 ₹12,500 | 42 ₹10,500 | 35 ₹8,750 | 20 ₹5,000 Lowest |
| 9.00 | Taking up or down 80 mm bore CI/DI/GI water mains (including all fittings), with spigot and socket ends and lead joints including burning out joints and recovering lead, laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. Note :-Excavation and earthwork shall be measured and paid for separately. | 100 | RM | 50 ₹5,000 | 80 ₹8,000 | 55 ₹5,500 | 45 ₹4,500 | 60 ₹6,000 | 75 ₹7,500 | 90 ₹9,000 | 40 ₹4,000 Lowest |
| 10.00 | All as per Srl item No 09 above but 100 mm dia bore. | 80 | RM | 80 ₹6,400 | 90 ₹7,200 | 85 ₹6,800 | 51 ₹4,080 | 75 ₹6,000 | 95 ₹7,600 | 100 ₹8,000 | 45 ₹3,600 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
1 Aug 2026, 6:00 pmClosed
GE (AF) No.2 Jodhpur
GE (AF) No.2 Jodhpur
REPAIR MAINT OF CI GI WATER PIPELINE AND ALLIED WORKS INCLUDING CLEANING OF OHTS UG SUMPS, REPAIR MAINTENANCE OF PUMPS AND ELECTRIC MOTORS AND REPAIR MAINT OF SOLAR WATER HEATERS AND ALLIED WORKS AT AF STNMANDOREAT AF STN MANDORE UNDER AGE EM, GE A
2026_MES_777788_1
8615/E8
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) No.2 Jodhpur
As per tender document
8 documents required · 8 mandatory
₹500
GE (AF) No. 2 Jodhpur
₹80,000
Yes
18 Sept 2026
10 Jul 2026
3 Aug 2026
10 Jul 2026
1 Aug 2026
25 Jul 2026
11 Jul 2026 - 17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in hard/dense soil/rocks, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 15 | CUM | - | - |
| 2 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 12 | CUM | - | - |
| 3 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 3 | CUM | - | - |
| 4 | Taking up or down 15mm bore galvanised steel water tubing including connections, fixed in walls, ceiling or laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. Note :-Excavation and earthwork shall be measured and paid for separately | 550 | RM | - | - |
| 5 | All as per Srl item No 4 above but 20 mm dia bore. | 780 | RM | - | - |
| 6 | All as per Srl item No 4 above but 25 mm dia bore. | 500 | RM | - | - |
| 7 | All as per Srl item No 4 above but 40 mm dia bore. | 370 | RM | - | - |
| 8 | All as per Srl item No 4 above but 50 mm dia bore. | 250 | RM | - | - |
| 9 | Taking up or down 80 mm bore CI/DI/GI water mains (including all fittings), with spigot and socket ends and lead joints including burning out joints and recovering lead, laid under floor or laid in trenches etc complete all as specified and directed by Engineer-in-charge. Note :-Excavation and earthwork shall be measured and paid for separately. | 100 | RM | - | - |
| 10 | All as per Srl item No 09 above but 100 mm dia bore. | 80 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
tenderdocument.pdf
Tender Documents • 1.35 MB
BOQ_871137.xls
BOQ • 0.79 MB
corrigendum.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .