| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC | 1 | Accepted-AOC Lowest rate quoted bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical Rate Quoted is more than that of lowest bidder |
Tender Value
₹9.8 L
EMD Value
₹24,500
Closing Date
28 Jul 2020, 6:00 pmClosed
Assistant Executive engineer
Office of Assistant Executive engineer Kuttanad Development Sub Division (MI Sub division) 1st Floor Mini Civil Station Cherthala 688524
Desilting of Kinath Kumbel Iranikkal thodu in ward No.2 of Arookkutty panchayath.
2020_Irrig_372639_1
10/AEE/KDSNC/2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
AROOKUTTY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
online
₹24,500
28 Oct 2020
20 Jul 2020
30 Jul 2020
20 Jul 2020
28 Jul 2020
20 Jul 2020
20 Jul 2020 - 27 Jul 2020
Amount
SCHEME 1-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7887/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 0 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =0 cum < br> MACHINERY
SCHEME 2-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7899/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME -3 DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7899/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME-4-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7899/2020_2021/KP : Earth work in excavation by mechanical means(hydraulic excavator ) manual means over areas ( exceeding 30 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =30 cum < hr> MACHINERY
SCHEME -5-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7967/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual meansover areas ( exceeding 0 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m andlift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed(2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulicexcavator per hour =30 cum < br> MACHINERYDetails of cost for 10 cum.
SCHEME-6-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7887/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual means over areas ( exceeding 0 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m and lift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed (2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulic excavator per hour =0 cum < br> MACHINERY
SCHEME-7-DESILTING
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od7967/2020_2021/KP : Earth work in excavation by mechanicl means(hydraulic excavator ) manual meansover areas ( exceeding 0 cm in depth ,1.5 m in width as well as 10 sqm on plan including lead up to 50 m andlift up to 1.5 m and forming bunds on both banks using excavated earth to be leveled and neatly dressed(2.6+ 20% for under water ) for all kinds of soil details of cost for 10 cum average out put of hydraulicexcavator per hour =30 cum < br> MACHINERYDetails of cost for 10 cum.
MUDOOR CONSTRUCTION
C.A BASHEER
GEORGE T J
Bidder Name
MUDOOR CONSTRUCTION
C.A BASHEER
GEORGE T J
ELDHOSE K PAUL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_527696.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .