| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST LOWE₹5.3 LAccepted-AOC | ₹5.3 L | FIRST LOWE | Accepted-AOC FIRST LOWEST |
| 2 | Rejected-Technical | - | - | Rejected-Technical THIRD LOWEST |
| 3 | PRIYADARSHINI ARTISANS LABOUR CONTRACT CO OPERATIVE SOCIETY Rejected-Technical | - | - | Rejected-Technical SECOND LOWEST |
| 4 | Rejected-Technical | - | - | Rejected-Technical FOURTH LOWEST |
Tender Value
₹5.4 L
EMD Value
₹15,000
Closing Date
28 Oct 2021, 6:00 pmClosed
ASSISTANT ENGINEER, LSGD
ASSISTANT ENGINEER, LSGD, THIKKODI GP
KIDANHIKKUNNU - MADATHILMUKKU ROAD
2021_LSGD_445118_1
AE/LSGD/TKD/19/21-22
Open Tender
Civil Works - Roads
Item Rate
300 days
THIKKODI
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,200
Yes
₹15,000
Yes
3 Mar 2022
16 Oct 2021
30 Oct 2021
16 Oct 2021
28 Oct 2021
16 Oct 2021
Amount
Road retarring
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 m Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
75.5.5.A.1pb : Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
3.15.1 : Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
4.9 : Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.6.A.1.2pb : Surface Dressing using Bituminous (Penetrations grade / modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100 kN static roller including cleaning the road surface as per Technical Specification Clause 507. <br> (A) By Manual Means <br> Case - I: Nominal Chipping Size 13.2 mm <br> II Bitumen S-65
75.5.2.2pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.9.1.2pb : 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates<br> Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. <br> Case - I By Manual Means <br> (II) Bitumen (S-65)
75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
75.8.1.1 : Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) for substructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203 as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
Thrukkottur Labour Contract Co-operative Society Ltd No. 2868
MOODADI LABOUR CONTRACT CO-OP SOCIETY
VALSAN V
Bidder Name
Thrukkottur Labour Contract Co-operative Society Ltd No. 2868
VALSAN V
PRIYADARSHINI ARTISANS LABOUR CONTRACT CO OPERATIVE SOCIETY
MOODADI LABOUR CONTRACT CO-OP SOCIETY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_634330.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .