Loading…
Loading…
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
28 Sept 2026, 1:00 pmDue tomorrow
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
Strengthening Renovation of outlived 20000 Glns Collection Tank at Sokar under WSS Panihad. (under Distt. Capex)
2026_PHE_320745_2
e-nit No. 12 of 2026-27 dated 12-08-2026
Open Tender
Civil Works
Percentage
20 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
OFFICE OF THE XEN JAL SHAKTI PHE DIV. RAJOURI
₹1,960
28 Sept 2026
12 Aug 2026
29 Sept 2026
12 Aug 2026
28 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil. | 2.72 | cum | 592.9 | ₹1,612.69 |
| 2 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead | 26.49 | Sqm | 38.9 | ₹1,030.46 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding cost of centring and shuttering. All work upto plinth level with 1:3:6 mix (1 cement:3 course sand :6 graded stone aggregate 20mm nominal size) incl. | 3.93 | cum | 5,733.6 | ₹22,533.05 |
| 4 | Reinforced cement concrete in walls (any thicknesss) including attaching pilasters, butresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but exluding cost of centring, shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.01 | cum | 9,821.85 | ₹19,741.92 |
| 5 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-mechanically treated bars of grade Fe-500 D or more. | 130 | Kg | 123.2 | ₹16,016 |
| 6 | 12mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand) | 55.28 | Sqm | 283.8 | ₹15,688.46 |
| 7 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 25.8 | Sqm | 98.75 | ₹2,547.75 |
| 8 | Centering and shuttering including strutting, propping etc and removal of form work for Retaining walls, return walls, walls (any thickenss) including attached pilasters butresses, plinth and string course fillets kerbs and steps etc. | 8.73 | Sqm | 286.35 | ₹2,499.84 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of
approved steel primer all complete.Welded | 32 | kg | 138.2 | ₹4,422.4 |
| 10 | .Carriage of cement by Mechanical Transport from nearest market (to be identified by engineer in charge) to road side of work including cost for loading and unloading.for an av. distance of 30Km and 700m Head Load | 1.78 | MT | 663.9 | ₹1,181.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1067433.xls
BOQ • 0.24 MB
corri.pdf
PDF • 0.71 MB
corri.pdf
PDF • 0.71 MB
corri.pdf
PDF • 0.72 MB
corri.pdf
PDF • 0.72 MB
corri.pdf
PDF • 0.71 MB
corri.pdf
PDF • 0.71 MB
corri.pdf
PDF • 0.71 MB
corri.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .