Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹29.5 L
EMD Value
₹30,000
Closing Date
10 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Rajkot Irrigation Project Division, Rajkot
Supplying Of Man Power at Bhadar-2 Dam Site For The Year 2026-27
280027
RIPD 22 of 2025-26
Open
Civil - All
Works
Rajkot
8 documents required · 8 mandatory
₹1,500
Yes
Executive Engineer Rajkot Irrigation Project Division Rajkot.
₹30,000
Yes
24 Feb 2026
24 Feb 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
BILL OF QUANTITIES (SCHEDULE - B)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
1 Engaging Un-Skilled labours for Flood Management & Other 2013.00 Man day 690.09 (Rupees Six
Miscellaneous works hundred Ninety And
Nine Paisa Only)
2 Engaging Skilled labours for Flood Management & Other Miscellaneous 2166.00 Man day
works hundred Nineteen
(Rupees Twenty Nine Lakh Fourty Seven Thousand Nine Hundred Ninety Nine And Paisa Seventy One Only)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
I/We/ am/are willing to carry out the work at ---------------------- % Below / Above ………….. % ( should be written in figures and words) of the
estimated rates mentioned above amount of my / our tender works out as under
Estimated Amount Estimated Amount
Put to tender Rs……………….. Put to tender Rs………………..
Deduct …….. % Below Rs…………. Add …….. % Above Rs………….
Net Rs………… Total Rs…………
( Please strike out whichever is not applicable)
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as
stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate mentioned in all the tender.
Signature of contractor. Executive Engineer
Rajkot Irrigation Project Div.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. ONLINE_NOTICE.pdf
2. SBD Supplying Man power at bhadar-2 PART-01.pdf
3. SBD Supplying Man power at bhadar-2 -25PART-02.pdf
4. SCHEDULE B Supplying Man power at Bhadar-2 2025.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .