Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC 17 01 DISTRICT TREASURY THAMARASSERY | KOZHIKODE | KERALA | 612906 | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 L+₹13,799.62 (9.23%)Rejected-AOC PARPIDAM II KOYILANDY PO KOZHIKODE | KOZHIKODE | KERALA | 612906 | ₹1.6 L+₹13,799.62 (9.23%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 L+₹24,383.55 (16.3%)Rejected-AOC NADAPURAM GRAMA PANCHAYAT PO KALLACHI 673506 | KOZHIKODE | KERALA | 673506 | ₹1.7 L+₹24,383.55 (16.3%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | AJAY M T L3 | JIMMI DAVID L1 | DINESAN N M L2 |
|---|---|---|---|---|---|---|
| 1.00Jungle clearance | ||||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 27 | each | 2,592.49 ₹69,997.23 | 2,229 ₹60,183 Lowest | 2,434.69 ₹65,736.63 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 8 | each | 12,032.78 ₹96,262.24 | 10,345 ₹82,760 Lowest | 11,300.35 ₹90,402.8 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 4 | each | 398.91 ₹1,595.64 | 343 ₹1,372 Lowest | 374.63 ₹1,498.52 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 3 | each | 714.04 ₹2,142.12 | 614 ₹1,842 Lowest | 670.57 ₹2,011.71 |
| 1.00 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 4 | each | 970.83 ₹3,883.32 | 835 ₹3,340 Lowest | 911.74 ₹3,646.96 |
Tender Value
₹1.5 L
EMD Value
₹3,780
Closing Date
30 May 2026, 6:55 pmClosed
Assistant Executive Engineer
o/oAssistant Executive Engineer KyIP Canal Subdivision Vadakara
GENERAL-Monsoon preparedness 2026-27Emergency works under KyIP section No.1 ,Vatakara -General Civil Work
2026_Irrig_852625_1
IRR/PI/TR/2967/2026_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
90 days
Maniyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,780
Yes
25 Jul 2026
23 May 2026
2 Jun 2026
23 May 2026
30 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Jungle clearance | |||||
| 1.001 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.002 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.003 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.004 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.005 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440682.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sb.pdf
Tender Documents • 1.63 MB
BOQ_1440682.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .