Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.6 LAccepted-AOC | ₹62.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹62.7 L+₹5,146.88 (0.08%)Rejected-Finance DOON VALLEY UTTARAKHAND UT | ALMORA | UTTARAKHAND | 263601 | ₹62.7 L+₹5,146.88 (0.08%) | L2 | Rejected-Finance L2 |
| 3 | L3₹63.9 L+₹1.3 L (2.07%)Rejected-Finance | ₹63.9 L+₹1.3 L (2.07%) | L3 | Rejected-Finance L3 |
| 4 | L4₹64.5 L+₹1.9 L (3.05%)Rejected-Finance | ₹64.5 L+₹1.9 L (3.05%) | L4 | Rejected-Finance L4 |
| 5 | L5₹64.6 L+₹2.0 L (3.15%)Rejected-Finance | ₹64.6 L+₹2.0 L (3.15%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | GOLJU CONSTRUCTION L2 | Bharat Singh Adhikari L6 | Ganesh Mehta L3 | MAHESH SINGH L1 | Jeevan Singh Mehra L7 | kamal verma L4 | Gopal Singh Bagadwal L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 167.05 | cum | 188 ₹31,405.4 | 200 ₹33,410 | 100 ₹16,705 Lowest | 170 ₹28,398.5 | 187.52 ₹31,325.22 | 145.59 ₹24,320.81 | 181.61 ₹30,337.95 |
| 2.00 | Filling available excavated earth in trenches, plinth in layers consolidating by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 107.75 | cum | 142 ₹15,300.5 | 160 ₹17,240 | 100 ₹10,775 Lowest | 140 ₹15,085 | 141.2 ₹15,214.3 | 109.63 ₹11,812.63 | 136.75 ₹14,734.81 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 23.54 | cum | 4,935 ₹1,16,169.9 | 5,000 ₹1,17,700 | 4,800 ₹1,12,992 | 4,500 ₹1,05,930 Lowest | 4,907.53 ₹1,15,523.26 | 5,195.59 ₹1,22,304.19 | 4,752.81 ₹1,11,881.15 |
| 4.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.42 | cum | 5,297 ₹55,194.74 | 5,500 ₹57,310 | 3,000 ₹31,260 Lowest | 5,000 ₹52,100 | 5,267.19 ₹54,884.12 | 5,080.7 ₹52,940.89 | 5,101.14 ₹53,153.88 |
| 5.00 | P/L in position RCC 1:1.5:3 excluding the cost of c/shuttering finishing and reinf All work upto plinth level(in foundation) | 48.78 | cum | 6,530 ₹3,18,533.4 | 6,200 ₹3,02,436 Lowest | 7,000 ₹3,41,460 | 6,500 ₹3,17,070 | 6,516.77 ₹3,17,888.04 | 6,592.67 ₹3,21,590.44 | 6,311.33 ₹3,07,866.68 |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:6 (1 cement : 6 c/sand). | 12.38 | cum | 5,150 ₹63,757 | 6,000 ₹74,280 | 5,500 ₹68,090 | 5,000 ₹61,900 | 5,138.24 ₹63,611.41 | 5,198.08 ₹64,352.23 | 4,976.26 ₹61,606.1 Lowest |
| 7.00 | R.C.C work 1:1.5:3 in wall plinth and string courses column pillars piers abutments posts & struts etc upto floor five levelex. Cost of c/shuttreing, finishing and reinf. | 17.34 | cum | 6,500 ₹1,12,710 | 8,500 ₹1,47,390 | 8,500 ₹1,47,390 | 500 ₹8,670 Lowest | 7,818.73 ₹1,35,576.78 | 7,909.78 ₹1,37,155.59 | 7,572.24 ₹1,31,302.64 |
| 8.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) beams,s/shades, shelf ,stair case,door bend and suspended slabs etc. ex. cost of c/shuttering, finishing and reinf. | 97.82 | cum | 8,310 ₹8,12,884.2 | 8,000 ₹7,82,560 | 8,400 ₹8,21,688 | 6,000 ₹5,86,920 Lowest | 8,288.83 ₹8,10,813.35 | 8,385.36 ₹8,20,255.92 | 8,027.52 ₹7,85,252.01 |
| 9.00 | Centering and shuttering i/c strutting propping etc and removel of form for foundations footings bases of columns etc for mass concrete. | 60.48 | sqm | 283 ₹17,115.84 | 200 ₹12,096 | 150 ₹9,072 Lowest | 300 ₹18,144 | 282.51 ₹17,086.2 | 182.78 ₹11,054.53 | 273.61 ₹16,547.93 |
| 10.00 | Centering and shuttering i/c strutting propping etc and removel of form for Suspended floors roofs landings balconies and access platform. | 407.44 | sqm | 450 ₹1,83,348 | 500 ₹2,03,720 | 350 ₹1,42,604 Lowest | 500 ₹2,03,720 | 668.02 ₹2,72,178.07 | 432.2 ₹1,76,095.57 | 646.96 ₹2,63,597.38 |
Tender Value
₹78.4 L
EMD Value
₹1.6 L
Closing Date
28 Nov 2024, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
Construction of dilapidated building of Government Inter College Chaira Hawalbagh Almora.
2024_RES_78079_1
1137 Dated 13-11-2024
Open Tender
Civil Works - Buildings
Item Rate
365 days
Hawalbag Almora
Construction of dilapidated building of Government Inter College Chaira Hawalbagh Almora.
2 documents required · 2 mandatory
₹4,720
Rs. 4000 D.H. and Rs. 720 GST
₹1.6 L
4 Feb 2026
21 Nov 2024
29 Nov 2024
21 Nov 2024
28 Nov 2024
21 Nov 2024
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .