Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BHAGWATI COMPLEX UNCHAPUL KALA DHUNGI ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹41.0 L
EMD Value
₹90,000
Closing Date
10 Jun 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
office of Superintending Engineer 4th Circle P.W.D. Rudrapur (U.S. Nagar)
Jafarpur Gularbhoj Road (VR) SDBC work, against renewal for the year of 2020-21 of Distt. Udhamsingh Nagar Block Gadarpur at Km 1 to 3.
2020_pwd_24039_1
1081/23M-04/2020 Date 27.05.2020
Open Tender
Civil Works - Roads
Item Rate
60 days
Gadarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer P. D. P.W.D. Rudrapur
₹90,000
10 Jun 2020
3 Jun 2020
10 Jun 2020
3 Jun 2020
10 Jun 2020
3 Jun 2020
120 days
Amount
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in lace method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. Using naturally occuring grave
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with 1 km lead)
Prime Coat ,Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm,
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction) for GradingII(19 mm nominal size)
Providing and laying Semi Dense Bituminous Concretewith100-120 TPH batch type HMP producing an average out put of 75tonne asper hour using crushed aggregates of specified grading, premixed with bituminous binder @4.5% of mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller stoachieve the desired compaction asper MoRTH specification clauseNo.508 complete in all respects (Grading II - 10mm using VG - 30 bitumen)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
ganda construction company
stage.html
html • 0.02 MB
finance_28628.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .