| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹4.9 LAccepted-AOC PASCHIM TARANAGAR MMC WARD NO 13 P O MOHANPUR TRIPURA WEST PIN 799211 | WEST TRIPURA | TRIPURA | 799211 | ₹4.9 L | 1st | Accepted-AOC Quoted Reasonable Rate |
| 2 | 2nd₹5.0 L+₹2,376.19 (0.48%)Rejected-AOC TULABAGAN U D NAGAR MOHANPUR WEST TRIPURA 799211 | MOHANPUR | WEST TRIPURA | TRIPURA | 799211 | ₹5.0 L+₹2,376.19 (0.48%) | 2nd | Rejected-AOC Quoted High Rate |
| 3 | 3rd₹5.0 L+₹4,849.37 (0.98%)Rejected-AOC | ₹5.0 L+₹4,849.37 (0.98%) | 3rd | Rejected-AOC Quoted High Rate |
| 4 | 4th₹5.1 L+₹13,675.22 (2.76%)Rejected-AOC | ₹5.1 L+₹13,675.22 (2.76%) | 4th | Rejected-AOC Quoted High Rate |
Tender Value
₹4.8 L
EMD Value
₹9,699
Closing Date
16 Apr 2026, 3:00 pmClosed
Chief Executive Officer
O/O CEO MNP
Const.of Pond Ghat Community based near Gopal Sarkar Land at Tulabagan 14 no. para of ward no.14 under Mohanpur Municipal Council during the year 2025-26.
2026_Urban_71896_1
67/MMC/MNP/2025-26 dt,30/03/2026
Open Tender
Civil Works
Percentage
180 days
As per DNIT
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
₹9,699
8 Jun 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
(A) .Without dewatering.
Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. (A).With out dewatering. I.Ordinary soil. (i).Upto 3mtr depth. | 29.67 | cum | - | - |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. 1.Sand filling. | - | cum | - | - |
| 3 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement) 1.P.C.C. grade M-10(using jhama brick aggregate) (i).Nominal mix 1:3:6 | - | cum | - | - |
| 4 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. | - | t | - | - |
| 5 | Centering shuttering including struttings, propping etc.
and removal of form work for:
Foundations, footings, bases for columns etc. for mass
concrete with timber plank | - | sqm | - | - |
| 6 | Centering shuttering including struttings, propping etc.
and removal of form work for:
Columns, Pillars, Piers, Abutments, Posts and Struts with
shuttering ply | 1 | sqm | - | - |
| 7 | Centering shuttering including struttings, propping etc.
and removal of form work for:
Suspended floors, roofs, landings, balconies and access
platform with timber planks | - | sqm | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick
aggregate 20 mm nominal size) | 1 | cum | - | - |
| 9 | Plastering with cement mortar (1:4) 12 mm thick on brick work/c.c. work including a finishing coat of neat cement pinning with 2.75 kg of cement per sqm in substructure as per MoRD technical specification clauses 613.4&1204. | - | sqm | - | - |
| 10 | Finishing with epoxy paint ( two or more coats ) of approved brand and manufacture at all locations prepared and applied as per manufacturer's specification on new work including appropriate priming coat, preparation of surface etc. complete. [Payment shall be made after submission of Test Certificate issued by the Manufacturer]
On steel work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
DNIeT67.pdf
Tender Documents • 4.10 MB
BOQ_73169.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .