Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.3 L+₹1.5 L (54.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.6 L+₹1.8 L (64.1%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.1 L+₹2.3 L (81.3%)Admitted-Finance NOT AVAILABLE | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
11 Jun 2026, 6:00 pmClosed
Er. Rakesh Kumar
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_311606_3
13 of 2026-27 dated 04-06-2026
Open Tender
Civil Works
Percentage
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹11,000
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
24 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Slip clearance, In soils; mixed with moorum/ Kankar/ shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 375 | Cum | 331.15 | ₹1,24,181.25 |
| 2 | Drain clearance in all kind of soil including its disposal upto 3 km | 360 | Cum | 200 | ₹72,000 |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 1,287.5 | Sqm | 24.12 | ₹31,054.5 |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,800 | Sqm | 12.49 | ₹22,482 |
| 5 | Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete | 480 | Cum | 300 | ₹1,44,000 |
| 6 | Hand-packing stones in wire-crates of mechanical woven double and twisted , hexagonal wire mesh gabion zinc coated mesh type 100 x120mm mesh wiere dia 2.70mm salvage wire dia 3040mm lacing wire dia 2.20mm ( as per national / international standards crate size 6 x1.2 x1.2mtr including cost of crates and stones with all leads and lifts carriage complete | 86.4 | Cum | 1,700 | ₹1,46,880 |
| 7 | Supply of machinery/JCB including POL for maintenance of road as directed by engineer-in-charge. | 10 | Hrs. | 950 | ₹9,500 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
BOQ_1008913.xls
BOQ • 0.24 MB
Corrigendum2.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .