Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.6 Cr
EMD Value
₹8.6 L
Closing Date
2 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE PRED PR KAKINADA
Kakinada
Providing Housing and infrastructure in R&R colny at Yellavaram (V) of Addateegala (M). Est.Rs.1044.86 lakhs
1010036
NIT73/DB/R&R Grant 2026-27 Dt.31.10.2026 of the SE PR KKD in 1st call
OPEN - NCB
Civil Works
ALLURI SETHARAMA RAJU
17 documents required · 16 mandatory · 1 optional
₹11,800
₹8.6 L
18 Nov 2026
18 Nov 2026
18 Nov 2026
23 Nov 2026
90 days
Name of work : Providing Infrastructure and Civil Amenities For 89 Pdfs Of R & R Colony In S. No's (2) Yellavaram (V) of Addateegala (M), for Rehabilitatoin Of Chintharegulapalli Village of V.R. Puram ( M),Under Polavaram Irrigation Project,Est.Cost of Rs.10.4486 Crores Construction of Houses(89 Nos) Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including over head charges&contractors profit but excluding GST and Seignorage Charges.
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,complete for finished item of work. (APSS No. 402) including overhead charges & Contractor profit, But excluding GST & Seignorage charges.
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished iC5:C6tem of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Columns
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit, But excluding GST & Seignorage charges.complete for fnished item of work(APSS NO.309&310)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Plinth Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Roof Slab 100mm thick.
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Roof Beam.
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Lintels.
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER R with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST for Sunshades.
Solid Fly-ash Block masonry 200 mm thick for basement & steps with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement. including overhead charges & Contractor profit, But excluding GST
Solid Fly-ash Block masonry 140 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Superstructure. including overhead charges & Contractor profit, But excluding GST
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges. (APSS No.126) including overhead charges & Contractor profit, But excluding GST
Additional items of Houses(89 Houses): Filling with Selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., complete for fnished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges.(APSS NO.309&310)
Solid Fly-ash Block masonry 140 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
RCC M-20 Grade Nominal Mix Concrete corresponding to IS 456 using MIXER with 12 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges.for 50MM thick Platforms
RCC M-20 Grade Nominal Mix Concrete corresponding to IS 456 using MIXER with 12 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges.for 50MM thick Platforms.for 25MM thick Shelves
Reinforced Brick Masonry for partition walls (110 mm thick) in CM (1:6) prop.(Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, excluding cost of seigniorage charges on all materials, scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, complete but excluding cost of steel and its fabrication charges for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges.(APSS No. 509 & 501) for:-Reinforced Brick Masonry in CM 1:6 (Country)
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges. (SS 901,903 & 904) for:-Ceiling Plastering in CM (1:5): 12 mm
Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges. (SS 901,903 & 904)
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), over roof slab
Supply and fixing windows with cement frame including MS grill and mullion of section 100mm x 65 mm with 16mm thick cement bonded particle board including cost and conveyance of all materials to site, supply and fixing 4 nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked 4 Nos of MS powder coated butt hinges 100mm long, 2 Nos of aluminium tower bolt of 100 mm, 2 Nos of 100 mm long aluminium handles including fixing the fixtures to window with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc. complete for finished item of work as per approved drawing.
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and overheads & contractors profit complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage Charges. ( APSS No.126 )
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work including over head charges&contractors profit but excluding GST and Seignorage . (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Supply and fixing doors with cement frame of section 100mm x 65 mm and ISI marked flush door shutters of 30mm thick shutter with bond wood solid block board type Core including cost and conveyance to site of cement frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm long of 40 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 2 Nos. butt hinges (IS:205) 150mm long, 2 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 150 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm)for door 0.9 m x 2.00 m
Supply and fixing doors with cement frame of section 100mm x 65 mm and ISI marked flush door shutters of cement shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of cement frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage charges as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for door 0.75 m x 2.00 m
Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage .(SS 901,903 & 904) for flooring plastering
Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work in all floors.
White washing two coats with white cement to ceiling ,inside & outside to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., complete for finished item of work including over head charges&contractors profit but excluding GST in all floors.
Painting to new iron works with 2 coats of synthetic enamel paint of approved brand and shade over 1 coat of red oxide primer of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work including over head charges&contractors profit but excluding GST for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats + 1 coat Iron primer to windows
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection including over head charges&contractors profit but excluding GST to doors
Sub Work - Construction of Individual Toilets Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 75 mm thick
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry 140 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc..,for inside & out side
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.inside & outside.
Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc.,including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Supply and fixing of Bath room / Toilet door shutter with 16mm BISON Lam (IS 14276) door shutter with all-round ‘U’ lipping of PPS section of size 12mm X 18mmX 12mmX0.6mm thickness with a hardware of 12mm dia X200mm long aluminum aldrop – 2 nos( ISI make)2 No of 125mm long handles(ISI make) and also 3 no Of IS304 grade Patee Hinges 3mmX12mmX180mm long with pole receiver of 10mm dia pole X40mm long welded on 2mm X40mm(ss304) plates works as receiver for RT patte hinges. The price inclusive of all material at site including overheads & contractors profit but excluding GST
Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation including overheads & contractors profit but excluding GST etc., Rcc Well Rings for Soak pits
Manufacture, Supply and Delivery of R.C.C. Collars conforming to B.I.S. 458/2003 (rate per each collar) suitable for R.C.C. Plain ended pipes including transportation including overheads & contractors profit but excluding GST etc., Rcc Well Ring Covers for Soak pits
Supplying and fixing of 110mm SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges including overheads & contractors profit but excluding GST etc., complete for finished item of work at all floor levels.
Supplying and fixing NP Bib Tap of size 12.70mm dia of Indian make Seiko or equivalent including cost and conveyance of all materials, labour charges, overheads & contractors profit but excluding GST etc., complete for finished item of work in all floors.
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame andcover of 20 Kg. including overheads & contractors profit but excluding GST etc.,
Sub Work - Construction of Temple Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry 200 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., & including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with white cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including overheads & contractors profit but excluding GST & Seignorage etc..,, complete for finished item of work, (BLD-CSTN-9-4)B48
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls for:-Internal Colouring - acrylic emulsion paint - 2 Coats + 1 coat primer
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection. including overheads & contractors profit but excluding GST
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 0.70mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for internal doors -(0.70x 2.10m)
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20mm dia SS pipe for Horizontal rows including fixing in position complete
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
Sub work - Temple Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Sub Work - Construction of Anganwadi Centre Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., & including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with white cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including overheads & contractors profit but excluding GST & Seignorage etc..,, complete for finished item of work, (BLD-CSTN-9-4)B48
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls for:-Internal Colouring - acrylic emulsion paint - 2 Coats + 1 coat primer
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection. including overheads & contractors profit but excluding GST
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.05mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 0.90mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for internal doors
Providing and fixing factory-made uPVC any colour sliding glazed window up to 1.50 m in height imensioncomprising of uPVC multi chambered frame with in built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket/TPV, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealant
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20m dia SS pipe for Horizontal rows including fixing in position complete
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
RCC Concrete M-20 grade as per IS 456 nominal mix using 12mm size nominal agreegate machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, including overheads & contractors profit but excluding GST and seignorage for:-Machine Mix-PCC : M-20 NOMINAL MIX with wooden centering up to 3.66M.-50 mm thick
Sub work - Anganwadi Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Sub Work - Construction of Community hall Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with white cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including overheads & contractors profit but excluding GST & Seignorage etc..,, complete for finished item of work, (BLD-CSTN-9-4)B48
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls for:-Internal Colouring - acrylic emulsion paint - 2 Coats + 1 coat primer
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection. including overheads & contractors profit but excluding GST
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.05mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 0.70mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Providing and fixing factory-made uPVC any colour sliding glazed window up to 1.50 m in height imensioncomprising of uPVC multi chambered frame with in built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket/TPV, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealant
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20mm dia SS pipe for Horizontal rows including fixing in position complete including overheads & contractors profit but excluding GST
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
Sub work - Community Hall Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Sub Work - Construction of School Building Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the M-25 Grade Vibrated reinforced Design Mix Concrete corresponding to IS 456 using MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry 140 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with white cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including overheads & contractors profit but excluding GST & Seignorage etc..,, complete for finished item of work, (BLD-CSTN-9-4)B48
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls for:-Internal Colouring - acrylic emulsion paint - 2 Coats + 1 coat primer
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection. including overheads & contractors profit but excluding GST
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.20mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Centre fixed both side openable shutterwindow 6’0”x4’0” (1828.8mmx1219.2mm). Outer frame section sizeof 48x50mm. Shutter frame section sizeof 48 x 25 mm. Mullion section size of 48x50mm. Fixed beading section sizeof 12 x 12mm.Providing & Fixing of OpenableWindows with Flymesh made of prepainted steel (Base Steel as per IS 513of 0.58 mm thick galvanized as per IS277 with zinc of 150 GSM) primercoated with epoxy primer of 5-7microns thick, finish painted with apolyester paint of 12-16 microns thickand back coated with 5-7 microns thickalkyd backer and the section for outerframe of 72 x 55mm, centre mullion of72 x 50mm, section for fixed glass beading section of 12 x 12 mm andsection for shutters of 48 x 25 mm andouter frame & mullion sections withrebate for glazed shutters, fly mesh and a 20 mmprovision for guard bars/grills and fly mesh shutter section of 20 x 40 mm andthe sections cut to length metre joined with corner bracket, centre mullionsfixed with mullion cap, stay, handles,latch 2 Nos of heavy duty stainless steelpivot hinges per shutter and panelledwith 5mm thick plain float glass and S.S.Mesh for fly mesh shutter (304 grade),fitted using rubber gaskets includingfixing the windows in theconcrete/masonry wall by means of selfexpanding screws, including 10mm Square guard bars with 6” (152.4mm) pitch , complete for finished item of work including overheads & contractors profit but excluding GST
RCC Concrete corresponding to M-20 grade as per IS 456 nominal mix using 12mm size nominal agreegate machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, including overheads & contractors profit but excluding GST and seignorage for:-Machine Mix-PCC : M-20 NOMINAL MIX with wooden centering up to 3.66M.-50 mm thick
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20mm dia SS pipe for Horizontal rows including fixing in position complete including overheads & contractors profit but excluding GST
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
Sub work - School - Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Sub Work - Construction of GCC Store Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 400 x 400 mm and thickness 25 mm of any shades.and white cement to get required reflective glazing, set over base coat of CM (1:8) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work,
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to New walls with two coats of arcylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after
Painting to new wood work with luppam finish, including applying metal paste coat to give even & smooth surface and painting two coats of synthetic enamel paint 1st grade of approved brand and shade to get glossy surface including cost and conveyance of all materials to site, all taxes and all labour charges etc. complete including sand paper on lappam coats for neat even and glossy surface etc. complete for all floors for finished item of work as directeda by Engineer-in-charge during exection. including overheads & contractors profit but excluding GST
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.20mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.05X2.10 and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Providing and fixing factory-made uPVC any colour sliding glazed window up to 1.50 m in height imensioncomprising of uPVC multi chambered frame with in built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket/TPV, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealant
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20m dia SS pipe for Horizontal rows including fixing in position complete
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
RCC M-20 grade as per IS 456 nominal mix using 12mm size nominal agreegate machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, including overheads & contractors profit but excluding GST and seignorage for:-Machine Mix-PCC : M-20 NOMINAL MIX with wooden centering up to 3.66M.-50 mm thick
Sub work - GCC - Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline.
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Site Levelling:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm thickness by mechanical means in area of light jungle including over head charges&contractors profit but excluding GST
Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work including over head charges&contractors profit but excluding GST and Seignorage.
Sub Work - Construction of post office building Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas) including overheads & contractors profit but excluding GST & Seignorage etc..,
Filling with selected earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for fnished item of work(APSS NO.309&310)
Filling with useful available excavated earth in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit but excluding GST complete for fnished item of work(APSS NO.309&310)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Footings
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Pedestals
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Plinth Beam
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Columns
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Beams
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Roof Slab 125 mm thick
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Lintels
Supply and placing of the Design mix concrete M-25 Grade corresponding to IS 456 with cement content of 380kgs per 1 cumof concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. including overhead charges & Contractor profit, But excluding GST and seignorage etc.., for Sunshades
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) For Basement
Solid Fly-ash Block masonry for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504 including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Fly Ash Block Masonry in CM 1:6 (290x200x140) .Superstructure :
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Supply and placing of the Plain Mix Concrete (1:4:8) proportion nominal mix (cement: fine aggregates: coarse aggregate) corresponding to IS 456 with minimum cement content of 162 kgs per 1 cum of concrete using concrete mixer machine with 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete including Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including mixing, centering, shuttering, laying concrete, curing &overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. for Dummy Columns
Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) from approved quarry from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete, curing, overheads & contractors profit but excluding GST & Seignorage etc..etc. complete for finished item of work. complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:3:6) NOMINAL MIX for Bed blocks
Ornamental plastering to ceiling 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for RCC exposed faces for finished item of work. (SS 901,903 & 904) including overheads & contractors profit but excluding GST & Seignorage etc.., for:-Ceiling Plastering 1/c in CM (1:5): 12 mm
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm
Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with 1 kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off the wall and slab junction etc., complete including overheads & contractors profit but excluding GST & Seignorage etc.., for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm
Flooring with Nano polished/stain free soluble salt porcelain vitrified tiles screen printed of size 600x600mm and thickness between 8-10mm 1st quality conforming to IS:13711, IS:13712,IS:13630(Parts 1 to 15 of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc.,complete for finished item of work.
Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 25 mm of any shades. set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with white cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including overheads & contractors profit but excluding GST & Seignorage etc..,, complete for finished item of work, (BLD-CSTN-9-4)B48
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., including overheads & contractors profit but excluding GST complete for finished item of work in all floors.
Painting to new walls with 2 coats of acrylic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-External Colouring - acrylic emulsion paint - 2 Coats+1 coat primer
Painting to New walls with two coats of arcylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors
Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Supply and fixing Cost of factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 63.5x100 MM framed Door of size 1.20mx2.10m and ISI marked Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mmthick conforming to IS:2202 including cost and conveyance to site including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) for external doors
Providing and fixing factory-made uPVC any colour sliding glazed window up to 1.50 m in height imensioncomprising of uPVC multi chambered frame with in built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket/TPV, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealant
RCC M-20 grade as per IS 456 nominal mix using 12mm size nominal agreegate machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as mixing, laying concrete, curing etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work, including overheads & contractors profit but excluding GST and seignorage for:-Machine Mix-PCC : M-20 NOMINAL MIX with wooden centering up to 3.66M.-50 mm thick
Cost supply and fixing SS railing of 50MM dia pipe for runners 40MM dia for Verticals and20mm dia SS pipe for Horizontal rows including fixing in position complete including overheads & contractors profit but excluding GST
Providing anti termite treatment as per IS 6315 (Part-2) 2001 (pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure confirming to IS 6315 (Part-2) 2001 and other relevent approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20% with 1% concentration @ 7.5 Liters/sqm of the vertical surface & 5.0 Liters/sqm of the horizontal surface of the substructure to a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyane of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge. including overheads & contractors profit but excluding GST
Sub work - post office - Electrification :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including overheads & contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including overheads & contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections including overheads & contractors profit but excluding GST etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer.
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including overheads & contractors profit but excluding GST
Supply and Run of 2 of 6 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including overheads & contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including overheads & contractors profit but excluding GST
Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting including overheads & contractors profit but excluding GST etc., complete.
Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. including overheads & contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including overheads & contractors profit but excluding GST
Supply and fixing of 18W/20W, 1200mm length LED batten light with extruded alluminium housing and polycarbonate cover, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete. Makes: Wipro / Phillips /Lighting Technologies(LT) / GEVenture / Crompton / Bajaj / VIN /Halonix/Jaquar/HPL/Havells/GM b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG. including overheads & contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Supply and Run of 4 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges overheads & contractors profit but excluding GST etc., complete for service mains.
Construction of Cattle tubs:Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage and dewatering charges etc including overhead charges & contractors profit but excluding GST and seignorage charges as per SS 20B (ApSS 308) in Ordinary Soil-Mechanial Means-Upto 3M depth (in restricted areas)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage . (APSS No. 402)
Solid Fly-ash Block masonry 200 mm thick for panel walls in Basement, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,cost of excluding seigniorage on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work including over head charges&contractors profit but excluding GST as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x200x140)
Plastering 12 mm thick in single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work including over head charges&contractors profit but excluding GST and Seignorage . (SS 901,903 & 904)
Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side walls, sump bottom slab, sides of septic tanks, sunken slabs etc., to required slopes with CM (1:3) prop. 12mm thick (average) mixed with 1kg of water proofing compound per bag of cement laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work including over head charges&contractors profit but excluding GST and Seignorage. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 12mm
White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., complete for finished item of work including over head charges&contractors profit but excluding GST in all floors.
Sub work - Electrification for houses :Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Roof Slabs with all required PVC deep boxes and all accessories including labour charges etc., complete.Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including over head charges&contractors profit but excluding GST
Supply and fixing of 20mm outer dia 2.00 mm thick Heavy grade with IS:9537 part 3 FRLS rigid PVC pipe (ISI MARK) concealed in Walls with all required PVC deep boxes and all accessories including labour charges etc., complete. Makes: VIP / Besto plast / GoldMedal / Million plast / GM / Sudhakar / Polyline. including over head charges&contractors profit but excluding GST
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including over head charges&contractors profit but excluding GST
Supply and fixing of 16A/20A ISI Mark 3/2 pin Modular socket with 16A 1-way Modular switch, 3 Module box with cover frame and GI box back box on common switch board with connections etc., complete. Accessories Makes: Legrand Lyncus / Havells Coral or G+ HPL Schneider / Livia / GM (G+ NINE) GX / CSB / Goldmedal (Curv/ Air) / Million Mway / Logus Platinal Panasonic Vision / Salzer S90series / Precision/Koncept (Samrat/ Qura) / Plowycab (Levana) / Anchor-Roma. including over head charges&contractors profit but excluding GST
Supply and fixing of ISI mark Batten holder /Slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W LED Lamp. (for New Installation)Makes: Anchor / Gold Medal Olive / Million Zoom Phillips / Crompton / Bajaj / Havells / Halonix/GM/HPL. including over head charges&contractors profit but excluding GST
Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FRLS-H / HFFR PVC insulated 1100V grade as per IS: 694 / 1990 specification for Copper cable and 1 run of 14/0.3mm (1.0 sq.mm) flexible copper wire for earthing in existing PVC/MS conduit pipe for circuit mains including labour charges (phase neutral and earth) etc., complete as requirement. Makes: Finolex / RR Kabel / Havells / Polycab / Gloster / Goldmedal / GM. including over head charges&contractors profit but excluding GST
Wiring with 2 run of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and cover plate and suitable size modular box fixing on separate board including all labour charges etc., complete. Copper Cable Makes: Finolex / RR Kabel / Havells / KEI / Polycab / Gloster / Goldmedal / GM. Accessories Makes: Legrand Lyncus / Havells Coral or Fabio / L&T / HPL / Schneider Livia / GM-G (NINE GX) / C&S / Goldmedal (Curve/Air) / Million Mway / Logus Platinal / Panasonic Vision / Salzer S90 Series / Precision/Koncept (Samrat/Qura) / Ploycab (Levana) / Anchor-Romal / IndoAsian / Pointer. including over head charges&contractors profit but excluding GST
Supply of fixing of Peeta Boards for Meter board including fixing of 32Amps DP and 32A Fuse Carriers. including over head charges&contractors profit but excluding GST
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board. including over head charges&contractors profit but excluding GST
Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. including over head charges&contractors profit but excluding GST
Providing independent earthing by exacavating a trench to a depth of 2.10 mtrs in all soils as per size specified in the data for main switches integrated circuit cutouts and meters with 40mm dia 'B' class GI pipe of TATA / Zenith / GST make of 1.8mts length duly providing 12mm dia 16No's holes and re-wired bolts, nuts and washers, checknuts, Hume pipe ring etc., as per IS specifications with necessary double GI earth wire No.8 SWG including filling with equal preparation of salt and charcoal in layers including cost and conveyance of all materials to site, labour charges and including overheads & contractors profit but excluding GST etc., complete for finished item of work.
Sub work - Const of OHSR - Const of Valve Chamber :Earth Work: Excavation of foundations and depositing on bank for all lifts and with an initial lead of 10m including all charges. including over head charges&contractors profit but excluding GST
filling with selected earth in foundation with fine sand including cost and conveyance of all materials and all labour charges, over head charges&contractors profit but excluding GST and Seignorage etc.., complete.
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,including overheads & contractors profit but excluding GST & Seignorage etc.., complete for finished item of work. (APSS No. 402)
RCC (1:1.5:3): Mix using 20mm size HBG using required quantity of steel per one cum of concrete including cost and conveyance of all materials and all labour charges but excluding cost of steel and its fabrication charges etc., complete for bottom
RCC (1:1.5:3): Mix using 20mm size HBG using required quantity of steel per one cum of concrete including cost and conveyance of all materials and all labour charges but excluding cost of steel and its fabrication charges etc., complete for Side wall
RCC (1:1.5:3): Mix using 20mm size HBG using required quantity of steel per one cum of concrete including cost and conveyance of all materials and all labour charges but excluding cost of steel and its fabrication charges etc., complete for cover Slab
Supplying, fitting and placing Fe - 500 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc.,including overheads & contractors profit but excluding GST etc.., complete for finished item of work ( APSS No.126 )
Plastering: 12mm thick CM (1:5) including cost and conveyance of all materials and all labour charges etc., complete.
Construction of New Borewell & Motor Drilling Bore Well with DTH Rig in all formations suitable DTH drilling150mm dia such as alluvial sand stone formations insertion of 180mm dia PVC 6kh/cm2 casing pipe but excluding cost pipe bail plug dummy and clamp set. and including bore development conducting yield test charges and fixing of pipe and bore development till clear water free from sand continuously excluding cost of pipes ets complete
Cost and supply of 180mm dia PVC 6kg/Sqcm casing pipe including all taxes.
Labour charges for Slotting of 180mm dia 6 kg/cm2 PVC pipe by lathe including cutting & slotting including all labour charges.
Supply, Delivery of ISI marked fully hot dipped galvanized deepwell Inida Mark-H Hand Pump assembly complete unit with 10 Nos of connecting rods (bright bar of 12mm dia and 100 mts length each confirming to IS 9301/1990 & IS 14101 to14104:1994 with their amendments / revisions but excluding taxes
Labour charges for erection of IM-II Hand Pump Assembly with all its accessories and with the required number of 32mmdia CI-13 GI pipes including all taxes and as per the directions ofthe department officers but excluding taxes.
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. Supply and Transportation of 10.00HP 5-10 Stage, star rated, Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi (ELEC-5.4.5 VP 207 with S.No 217 (a)) Including C.P
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. Panel board
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. 63mm dia HDPE,PE100, PN10,DN63
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. 2.50 sqm Flat cable wire
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. Bore cap
Cost and supply of 3HP, 5-10 Stage, Three phase, panel board,HDPE pipe,Cable wire and Clamp sets etc. including all taxes. 7/20 service wire
Cost and supply of 63 mm dia. 10 kg/cm2 HDPE pipe including all taxes.
Construction of OHSR of 20000 Litr Capacity with 12.8m Sagging for finished work including 2 coats of snowcem painting,lettering, fixing of all required fixtures, pipes, bends,valves, Raft foundation, etc. complete as per departmental designs and drawings. Fixtures include: 1. RCC/Aluminium inside ladder(.45 mtr wide) 2. RCC Spiral staircase 3. Lightening arrestor including conductor and earthing and Dog legged stair case of 1.0 mtr wide 4. Water level indicator of good quality with ebonite/copper float, approved pattern, 5. Ventilators 6. Man hole frame and cover 2 Nos. and 7. Railing GI or RCC at floor slab level, 8. RCC hand railing alround at top of reservoir. Basic rate per litre(including Raft foundation)( As per Litre ratre calculation)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQyellavaramfinal (1).xls
TENDER_DOCUMENT • 0.21 MB
SBDyellavaram.doc
TENDER_DOCUMENT • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .