Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 CrAccepted-AOC HOUSE NO 31 BYLANE NO 09 ZOO ROAD TINIALI RGB ROAD GUWAHATI 24 ASSAM | KAMRUP METRO | ASSAM | 781001 | ₹48.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹48.0 CrRejected-AOC 10 YUBRAJ PALACE OLD AFI ROAD CHANDMARI GUWAHATI 781003 | KAMRUP METRO | ASSAM | 781003 | ₹48.0 Cr | L2 | Rejected-AOC Not Awarded |
| Sl No | Description | Qty | Unit | M/S N.E. Infra L2 | THE MM ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
School Building:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 3,008.28 | Sqm | 34,000 ₹10.2 Cr | 34,000 ₹10.2 Cr |
| 2.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Boys Hostel:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 2,330 | Sqm | 38,000 ₹8.9 Cr | 38,000 ₹8.9 Cr |
| 3.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Girls Hostel:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 2,330 | Sqm | 38,000 ₹8.9 Cr | 38,000 ₹8.9 Cr |
| 4.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Warden Residence (Boys Hostel):- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 80 | Sqm | 31,000 ₹24.8 L | 31,000 ₹24.8 L |
| 5.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Warden Residence (Girls Hostel):- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 80 | Sqm | 31,000 ₹24.8 L | 31,000 ₹24.8 L |
| 6.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Principal Residence:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 130 | Sqm | 30,000 ₹39 L | 30,000 ₹39 L |
| 7.00 | Planning, Designing, and Construction on EPC Basis for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Kitchen & Dining Block:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 789.96 | Sqm | 26,000 ₹2.1 Cr | 26,000 ₹2.1 Cr |
| 8.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Type III Quarters (Block A )@ 8nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 640 | Sqm | 32,000 ₹2.0 Cr | 32,000 ₹2.0 Cr |
| 9.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Type III Quarters (Block B ) @ 8 nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 640 | Sqm | 32,000 ₹2.0 Cr | 32,000 ₹2.0 Cr |
| 10.00 | Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.-
Type II Quarters (Block A) @ 6 nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect.
Note :- Plinth Area shall be measured for the actual constructed. | 420 | Sqm | 33,000 ₹1.4 Cr | 33,000 ₹1.4 Cr |
Tender Value
₹48 Cr
EMD Value
₹96 L
Closing Date
29 Jan 2026, 3:00 pmClosed
Managing Director
Office of the Managing Director, APTDC Ltd., Ganeshguri, Ghy-5
Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District. on Engineering, Procurement and Construction (EPC) Mode-1
2026_WPTBC_49903_1
PTDC/Engg/2023-24/252
Open Tender
Civil Works
1080 days
Khoirabari
Please refer to tender document
3 documents required · 3 mandatory
₹20,000
₹96 L
Yes
Managing Director, APTDC Ltd., Ganeshguri, Ghy-5
23 Feb 2026
12 Jan 2026
29 Jan 2026
12 Jan 2026
29 Jan 2026
12 Jan 2026
12 Jan 2026
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- School Building:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Boys Hostel:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Girls Hostel:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Warden Residence (Boys Hostel):- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Warden Residence (Girls Hostel):- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Principal Residence:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Kitchen & Dining Block:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Type III Quarters (Block A )@ 8nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Type III Quarters (Block B ) @ 8 nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Type II Quarters (Block A) @ 6 nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Type II Quarters (Block B) @ 4 nos quarters:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Substation Building:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Pump Room with 2 nos of pump:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. (0.15 % of total) Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, Construction and Installation of equipments on EPC Basis for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Playground with running track, Volleyball court(2 nos), Kho kho, basket ball court(2nos) and archery:- with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, SAI(Sports authority of India) guidelines, NBA guidelines, FIVB guidelines NBC-2016 norms & IS Codes and guidelines complete in all respect.
Planning, Designing and Construction on EPC Basis for the work,"Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ” of Civil External Service Connections:- Boundary Wall (1.8 Meter Height) with a provision of .60 metre concertina wire, entrance gate, flag hoisting stage, internal roads, internal pathways, External Sewerage system, Earth Filling, levelling, cross drainage work(culvert) , complete in all respect, approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis for the work,"Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ” of Green Features:- Rain Water harvesting, Storm water drain and sewer,Sewage system, Solar Street Light, Horticulture and landscapping of campus , complete in all respect, approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis for the work,"Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ” of Drinking water:- Under ground sump, Deep boring with submersible pump7.5 HP, RCC stagging with overhead tank,External water supply system, Filtered water supply, complete in all respect, approval of the same by the Engineer- in-Charge.
Planning, Designing and Construction on EPC Basis for the work "Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ” of :-INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical External works and Service Connections ,Substation equipment including Transformer, Uninterrupted power supply, fire extinguishers, fire fighting system, Lightening arrestor for electrical substation and lightening conductor for buildings, SITC of UPS, SITC of CCTVs and all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis for the work “Construction of Eklavya Model Residential School (EMRS), Khoirabari in Udalguri District ”.- Security room:- including additional height,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NESTS guidelines, NBC-2016 norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Supplying, Installation, Testing and commissioning of complete School Furnitures and equipments, hostel furnitures for both boys and girls, furnitures for dining hall and kitchen equipments & machineries etc. with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work, NESTS guidelines and directions of Engineer In charge.
APDCL Load security.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Volume_I_NESTS.rar
Additional Documents • 39.40 MB
VOL_II_III_IV_V.rar
Additional Documents • 28.79 MB
BOQ_79322.xls
BOQ • 0.41 MB
SBD_EPC_Udalguri.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid