| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84.6 LAdmitted-Finance | -1.52% | ₹84.6 L | L1 | Admitted-Finance |
Tender Value
₹85.9 L
EMD Value
₹1.7 L
Closing Date
5 Mar 2026, 3:00 pmClosed
RAJEEV KUMAR RATHI EXECUTIVE ENGINEER NAGAR
NAGAR NIGAM BAREILLY
Construction of CC road and side pavement with CC tiles from the railway crossing at 31, Katghar, via Haji Shabbir Ahmeds house to Shamshads house.
2026_DOLBU_1118895_1
107/PA/NCAP/NNB/25-26 (1 To 20) Sr No 12 Tender List 22 Date-19.02.2026
Open Tender
Civil Works
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,148
Bareillye-tender.com
₹1.7 L
2 May 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
Dismantling of old damaged B.O.E. soling/C.C.Interlocking Tiles and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
Dismantling of bituminous road manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge As per D.S.R. No. 15.43.2
Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697)
Dismantling of old damage BOE C.C. tiles Road work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M
Cartage of Surplus earth upto 5km.
Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251)
Providing and laying cement concrete in 1:4:8 (1 cement: 4 C sand: 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I.
R.C.C. with work cement, approved coarse sand and 4cm gauge stone ballast in proportions of 1:2:4 in raft and foundation excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.GG.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour tools & plants etc required for proper completion of work. Binding wire cost being included in the item, (S.L.No.287)
R.C.C. work with cement, approved coarse sand and 4cm gauge stone ballast in proportions of 1:1.5:3 in wall and coloumn excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour tools & plants etc required for proper completion of work. Binding wire cost being included in the item, (S.I.No.289)
R.C.C. work with cement, approved coarse sand and 4cm gauge stone ballast in proportions of 1:1.5:3 in wall and coloumn excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour tools & plants etc required for proper completion of work. Binding wire cost being included in the item, (S.I.No.289)
Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
Fabrication of Mild steel or iron work of grill and stair case railling (When not included in an overall rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts and wastage etc. and there fixing if required for proper completion of work.(S.I.No.502c)
Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceefing 0.5m in depth and earthwork in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & slope & also including 1.50m lift & 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the Engineer-in-Charge. (Excluding Royalty) S.I. No. 253
Cartage of Surplus earth upto 5km.
Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273)
First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work SI N0.305
12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i)
Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
Construction of Granular sub (G.S.B.) by providing laying, spreding and compacting speciffied graded, crushed stone in sub base coarse including premixing the materials at O.M.C. in mechanical mixer (PlugMill) including carriage of mixed materials, laying in uniform layers with power roller to achieve the desired density including all materials, labour, machinery, lighting gaurding, barricading and maintance of deiversion complete of as per MORT &HT techincal specification clause No. 404A (Grade-3)
P/L of 125 micron Plastic Sheet
Providing and laying cement concrete in 1:1.5:3 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
Supply and Laying of rubber Moulded C.C Interlocking Tiles 80mm thick in road pavement having a compressive strength
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 28.18 MB
BOQ_2079997.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid