| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.4 L+₹28,106.19 (3.08%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | REJI JOSEPH L2 | V. JOY L1 |
|---|---|---|---|---|---|
| 1.00Annual Maintenance | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 48,777 | sqm | 8.7 ₹4,24,359.9 | 8.56 ₹4,17,531.12 Lowest |
| 1.00 | OD2432/2026-2027:Removing slushy decayed vegetation deposited on the the bed of canal up to 15cm by mechanical means (Hydraulic excavator)/ manual means and depositing the same at the places pointed out by the departmental officers within a lead up to 50 m and lift up to 1.5 m including levelling of the disposed spoil. | 13,997.25 | sqm | 11.2 ₹1,56,769.2 | 11 ₹1,53,969.75 Lowest |
| 1.00 | OD2431/2026-2027:Engaging man mazdoor during day and night for proper watching of canal and canal bund, operating shutters during water distribution and monsoon periods, carrying out urgent works required if any for delivering water at tail end, cleaning the under tunnels/well drops/siphon, removing floating materials, blockages and over growth of vegetation etc complete and disposal of the waste materials as per the direction of departmental officers at site. | 248 | each | 1,050 ₹2,60,400 | 998.85 ₹2,47,714.8 Lowest |
| 1.00 | OD2600/2026-2027:Engaging hydraulic excavator for removing the floating material and deposited waste from RBMC cross shutters and disposing the same as per the direction of departmental officer in site | 15 | hour | 1,390 ₹20,850 | 1,355.02 ₹20,325.3 Lowest |
| 1.00 | OD24816/2026-2027:Hire charge for conveying deposited floating material on RBMC canal bunds during water distribution as per direction of departmental officer in charge | 120 | km | 230 ₹27,600 | 214.41 ₹25,729.2 Lowest |
| 1.01 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 26 | each | 375 ₹9,750 | 348.57 ₹9,062.82 Lowest |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 26 | each | 670 ₹17,420 | 623.93 ₹16,222.18 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 12 | each | 900 ₹10,800 | 848.32 ₹10,179.84 Lowest |
| 1.01 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 4 | each | 1,240 ₹4,960 | 1,147.97 ₹4,591.88 Lowest |
Tender Value
₹9.9 L
EMD Value
₹24,701
Closing Date
26 Sept 2026, 11:30 amClosed
Assistant Executive Engineer
Assistant Executive EngineerIrrigation sub Division No.1, Chalakudy
Annual maintenance of RBMC between ch 13 000 km to 30 400 km
2026_Irrig_869176_2
IRR/PII/TR/2513/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Chalakudy
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,180
Yes
₹24,701
Yes
30 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
19 Sept 2026 - 26 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual Maintenance | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 48,777 | sqm | - | - |
| 1.002 | OD2432/2026-2027:Removing slushy decayed vegetation deposited on the the bed of canal up to 15cm by mechanical means (Hydraulic excavator)/ manual means and depositing the same at the places pointed out by the departmental officers within a lead up to 50 m and lift up to 1.5 m including levelling of the disposed spoil. | 13,997.25 | sqm | - | - |
| 1.003 | OD2431/2026-2027:Engaging man mazdoor during day and night for proper watching of canal and canal bund, operating shutters during water distribution and monsoon periods, carrying out urgent works required if any for delivering water at tail end, cleaning the under tunnels/well drops/siphon, removing floating materials, blockages and over growth of vegetation etc complete and disposal of the waste materials as per the direction of departmental officers at site. | 248 | each | - | - |
| 1.004 | OD2600/2026-2027:Engaging hydraulic excavator for removing the floating material and deposited waste from RBMC cross shutters and disposing the same as per the direction of departmental officer in site | 15 | hour | - | - |
| 1.005 | OD24816/2026-2027:Hire charge for conveying deposited floating material on RBMC canal bunds during water distribution as per direction of departmental officer in charge | 120 | km | - | - |
| 1.006 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 26 | each | - | - |
| 1.007 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 26 | each | - | - |
| 1.008 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 12 | each | - | - |
| 1.009 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 4 | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1477162.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PRILIMINARYAGREEMENT.pdf
Tender Documents • 0.21 MB
viewsbd.pdf
Tender Documents • 2.16 MB
epayment.pdf
Tender Documents • 0.01 MB
Affidavit.pdf
Other Document • 0.16 MB
integritypact.pdf
Tender Documents • 0.08 MB
FormofTender.pdf
Other Document • 0.24 MB
BOQ_1477162.xls
BOQ • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .