| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.7 L+₹47,540 (21.0%)Rejected-AOC E I HOUSE ERTHUMKADAVU MUTATHODY POST KASARAGOD 671121 | KASARAGOD | KASARAGOD | KERALA | 671121 | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.9 L+₹65,288 (28.9%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹2.5 L
EMD Value
₹6,339
Closing Date
30 Aug 2024, 11:30 amClosed
Assistant Executive Engineer
PWD Buildings Sub Division, Kanhangad
GENERAL-Maintenance work - Judge Quarters-Maintenance work to Judge quarters, Hosdurg in Kasaragod district-General Civil work
2024_PWD_686873_1
PWD/BLDG/4956/2024-2025 DT.19.08.2024
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kanhangad
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,339
Yes
9 Oct 2024
21 Aug 2024
2 Sept 2024
21 Aug 2024
30 Aug 2024
21 Aug 2024
Amount
APPENDIX-A
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
OD76411/2024-2025:Demolishing Laterite stone masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
OD76433/2024-2025: Laterate masonry with neatly dressed laterate stone of size 30x20x20 or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
OD76614/2024-2025:Engaged for coolie
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
E I MUHAMMED
ABDUL MUNAVAR E M
Bidder Name
E I MUHAMMED
ABDUL MUNAVAR E M
B.M ABDUL KHADER
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1068858.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .