Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.3 LAccepted-AOC | 1 | Accepted-AOC Lowest bid approved | |
| 2 | 2₹8.6 L+₹27,603.66 (3.33%)Rejected-Finance PWD S CONTRACTOR KUNHALINKIL HOUSE MARKET ROAD NILESHWAR | 2 | Rejected-Finance as per board resolution |
Tender Value
₹8.9 L
EMD Value
₹22,290
Closing Date
6 Dec 2019, 6:00 pmClosed
ASSISTANT ENGINEER,LSGD ,PULLUR PERIYA
ASSISTANT ENGINEER,LSGD ,PULLUR PERIYA
Construction of foot over bridge at illathukadave kodavalam in Pullur Periya GP
2019_LSGD_325531_1
AE/LSGD/PPGP/ET2/1/19-20
Open Tender
Civil Works - Bridges
Item Rate
365 days
CHALINGAL
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,142
Yes
online
₹22,290
Yes
17 Mar 2020
29 Nov 2019
10 Dec 2019
29 Nov 2019
6 Dec 2019
29 Nov 2019
Amount
Foot Bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.3 : Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.10.2 : Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
od375601/2019_2020 : Laterate masonry with neatly dressed laterate stone of size 35X20X20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc
SHAMEER A
Bidder Name
MAHATMA LABOUR CONTRACT CO-OPERATIVE SOCIETY
SHAMEER A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .