Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹28.7 L+₹16,571.15 (0.58%)Rejected-Finance 26 106 1 BUTTAIPETA KRISHNA ANDHRA PRADESH KRISHNA ANDHRA PRADESH 521001 | KRISHNA | ANDHRA PRADESH | 521001 | L2 | Rejected-Finance Highest bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Company/firm registration certificate of full document not attached |
Tender Value
₹26.8 L
EMD Value
₹67,059
Closing Date
2 Aug 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P)
As per Tender document
2022_ASI_700282_1
29/NIT/2022-23/Amaravati /Kakinada Sub circle
Open Tender
Civil Works
Works
90 days
Biccavolu
As per Tender document
7 documents required · 7 mandatory
₹0
₹67,059
Yes
O/o The SA, ASI, Amaravati Circle, Vijayawada
23 Aug 2022
12 Jul 2022
3 Aug 2022
12 Jul 2022
2 Aug 2022
12 Jul 2022
18 Jul 2022
Amount
Providing two coats of bone white /approved colour cem to the gopuras and sikharas over base coat of white colour cem after removal of mass and lichen by using ammonia with coir brush including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge.
Erection and removal of scaffolding and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m center to center, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube jallis, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. for the Painting to the Gopuras etc. including Labour charges etc. complete as per directions and approval of Engineer incharge. The elevational area of the scaffolding shall be measured for payment purpose.
Supply and fixing of location and direction sign boards of Size 4’x3’, made with Vertical posts = 2nos of 65x65x6 mm MS L angles, Frame = 40x40x4mm MSL angles, board= 4mm ACP Sheet and letters cut and fixed in 2 layers of 3M retro high reflective radium sheet (as per approved colour and text) and riveting the board to the frame through SS Rivets. including cost and conveyance of all materials, labour charges, cutting into required sizes, conveyance, Welding, painting to the signpost and frame with two coats of synthetic enamel paint over a primary coat of red oxide, fixing the sign posts in2 nos PCC (1:2:4) blocks of size (0.45x0.45x0.60m), all other applicable taxes etc. Complete item of work as directed by the site In – charge. (Drawing enclosed)
Carefully dismantling of old, damaged RCC Slab which is attached to the main temple and dispose the debris to a distance of 2.00 Km away from the monument including loading, unloading and Labour charges etc. complete item of work as directed by the site In – charge.
Providing centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platform etc., complete item of work as directed by the site In – charge.
Providing Steel reinforcement Mild steel and medium tensile steel bars for R.C.C. work including straightening, cutting, bending, placing in position and applying anti corrosive paint etc. all completeitem of work as directed by the site In – charge
Providing Reinforced Cement Concrete work in beams, roof slab to Mukha mandapa excluding cost of Steel, required centering, shuttering and reinforcement with 1:2:4 (1cement : 2 coarse sand :4stone aggregate 20mm nominal size) etc. completeitem of work as directed by the site In – charge.
Providing 20mm thick Cement Plastering in 1:3 (1Cement : 3 Coarse Sand) over the roof slab, Ceiling and beams including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge
Construction of Parapet wall in Brick masonry with 1st class bricks in cement mortar (1:6) including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge.
Plastering with cement mortar (1:4) one coat of 12mm thick Including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge.
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar etc. complete item of work as directed by the site In – charge.
Providing water tightening to the Antharala mandapam with lime mortar(1:2) 20mm thick plaster and finishing with special lime mortar (1:1.5) of 12mm thick after chipping the damaged lime plaster and removal of loose particles and debris through away from the monument including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge.
Providing Grouting to the gaps and hollow portions of the Gopuras and prakara walls with Lime mortar (1:2) including cost of materials and labour charges etc, competeitem of work as directed by the site In – charge.
Removal of old damaged doors and Provision for providing 1st class teak wood panelled door(nicely carved to match with the temple) for shrine of temple including cost of aldrops, hinges, tower bolts and other essential materials, labour charges etc. complete as per the enclosed drawing .
Providing Pointing to the joints of stone masonry of mandapa, main shrine walls and Gopuras etc. with Lime Mortar 1:2 (1Lime:2Sand) including Cost of Material and Labour charges etc. Completeitem of work as directed by the site In – charge.
Removal and reconstruction of damaged and out of plumb wall portion of the prakara wall with R.R. Stone in lime Mortar (1:2) and take away the debris from the monument including cost of materials and labour charges etc. completeitem of work as directed by the site In – charge.
Cost and Supply of Top Gear Lime Grinding Machine 200Kg. Capacity with 8guage bottom plate and 10guage drum plate, two Grinding wheels, and 7.50HP motor and 10HP Diesel Engine Dual power Pan Mixer for Conservation works including all costs and conveyance charges etc. completeitem of work as directed by the site In – charge.
LINGAM RAVI KIRAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .