Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance 306 B 2 SOUTH BLOCK BAHU PLAZA JAMMU 180004 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180004 | -46.21% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹83.6 L (20.7%)Admitted-Finance | -35.10% | ₹4.9 Cr+₹83.6 L (20.7%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 Cr+₹98.6 L (24.4%)Admitted-Finance | -33.11% | ₹5.0 Cr+₹98.6 L (24.4%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 Cr+₹1.4 Cr (35.8%)Admitted-Finance | -26.95% | ₹5.5 Cr+₹1.4 Cr (35.8%) | L4 | Admitted-Finance |
Tender Value
₹7.5 Cr
EMD Value
₹15.1 L
Closing Date
18 Mar 2026, 4:00 pmClosed
Er Syed Mehdi Executive Engineer TDA Kargil
Beamathang Kargil
Development of Hot Spring at Mulbekh.
2026_LAHDC_18485_1
E-TENDER 48 OF TDA KARGIL 2025-26
Open Tender
Civil Works - Buildings
Percentage
540 days
Mulbekh Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹7,530
Payable To ACCOUNT OFFICER TDA KARGIL
₹15.1 L
Office of Chief Engineer PW R and B UT Ladakh
4 May 2026
19 Feb 2026
19 Mar 2026
19 Feb 2026
18 Mar 2026
26 Feb 2026
23 Feb 2026 - 24 Feb 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,437.13 | Cum | 208.42 | ₹2,99,526.63 |
| 2 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil | 751.79 | Cum | 548.82 | ₹4,12,597.39 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: | 13,741 | Sqm | 88.96 | ₹12,22,399.36 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 718.57 | Cum | 220.4 | ₹1,58,372.83 |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: | 823.56 | Cum | 5,730.38 | ₹47,19,311.75 |
| 6 | Random rubble masonry with hard stone laid dry in foundation, plinth & walls Laid with bond stone. | 169.86 | Cum | 4,062.25 | ₹6,90,013.79 |
| 7 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=101 mm with tolerance of ±2%), Zinic+10% Al alloy+PVC coated, Mesh wire diametre 2.7/3.7mm (ID/OD),mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per metre of mesh perpendicular to twist, tying with lacing wire of diametre 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 201 mm, as per drawing, all complete as per directions of Engineer-in-charge. | 882.96 | Cum | 3,831.78 | ₹33,83,308.47 |
| 8 | Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade :
One face dressed
Red sand stone. | 225.41 | Cum | 82,594.23 | ₹1,86,17,565.38 |
| 9 | Providing and laying in position rammed earth in walls (Upto floor One level ) Providing and laying in position stabilized rammed earth with 8% cement in walls using mixture of selected earth and clay of gradation as directed by engineer in charge mechanically mixed, placed in position compacted by vibration including form work up to floor one level. | 90.67 | Cum | 6,341.6 | ₹5,74,992.87 |
| 10 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 259.67 | Cum | 537.71 | ₹1,39,627.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
Tendernotice_2.pdf
PDF • 6.94 MB
BOQ_44405.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .