Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹183.9 CrAdmitted-Finance | ₹183.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹191.6 CrAdmitted-Finance NO 17 WABAG HOUSE 200 FEET THORAIPAKKAM PALLAVARAM MAIN ROAD SUNNAMBU KOLATHUR CHENNAI KANCHIPURAM TAMIL NADU 600117 | CHENGALPATTU | TAMIL NADU | 600117 | ₹191.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹204.7 CrAdmitted-Finance HEAD OFFICE 8TH FLOOR EXPRESS CORPORATE PARK SECTOR 16A FILM CITY NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹204.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹375.2 CrAdmitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹375.2 Cr | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical JINDAL ITF CENTRE 28 SHIVAJI MARG MOTI NAGAR NEW DELHI 110015 INDIA | NEW DELHI | WEST DELHI | DELHI | 110015 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | LARSEN AND TOUBRO LIMITED L4 | VA TECH WABAG LTD L2 | Triveni Engineering and Industries Ltd. L3 | BEIL INFRASTRUCTURE LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00A) Design and Build Contract of various units for following: | |||||||
| 1.01 | a. Wastewater Pumping Stations – 38.25 MGD for Mitraon and 11.35 MLD for Jharoda | 1 | Nos | 55,14,10,821 ₹55.1 Cr | 10,73,99,617 ₹10.7 Cr | 15,54,00,000 ₹15.5 Cr | 26,51,08,380 ₹26.5 Cr |
| 1.02 | b. 17.0 MGD Capacity Wastewater treatment Plant Disposal Main up to Disposal point | 1 | Nos | 1,54,58,88,355 ₹154.6 Cr | 75,18,30,404 ₹75.2 Cr | 1,06,26,00,000 ₹106.3 Cr | 96,01,32,703 ₹96.0 Cr |
| 1.03 | c. K7 DI Pipe- (Open Cut) Length- 2200 Meter | 1 | Nos | 10,09,08,597 ₹10.1 Cr | 25,60,09,412 ₹25.6 Cr | 31,21,00,000 ₹31.2 Cr | 22,00,09,093 ₹22.0 Cr |
| 1.04 | d. K7 DI Pipe (Above Ground) Length- 100 Meter | 1 | Nos | 12,69,542 ₹12.7 L | 33,74,208 ₹33.7 L | 42,00,000 ₹42 L | 24,42,414 ₹24.4 L |
| 1.05 | e. MS Pipe (By Trenchless) Length- 200 Meter | 1 | Nos | 70,96,342 ₹71.0 L | 1,61,91,948 ₹1.6 Cr | 2,05,00,000 ₹2.0 Cr | 4,61,27,067 ₹4.6 Cr |
| 1.06 | f. K7DIPipe-(Open Cut)Length-400Meter | 1 | Nos | 7,25,519 ₹7.3 L | 28,94,411 ₹28.9 L | 21,00,000 ₹21 L | 32,25,250 ₹32.3 L |
| 2.00B) Operation and maintenance Cost | |||||||
| 2.01 | B-1 O&M cost for 15 years of Mitraon (Wastewater Pumping Stations
–38.25 MGD and Wastewater Treatment Plant–17.0 MGD) | 1 | Nos | 1,31,31,79,157 ₹131.3 Cr | 70,02,00,000 ₹70.0 Cr | 47,43,50,000 ₹47.4 Cr | 27,36,22,746 ₹27.4 Cr |
| 2.02 | B-2 O&M cost for 15 years for 11.35MLD for Jharoda SPS | 1 | Nos | 23,17,37,498 ₹23.2 Cr | 7,78,00,000 ₹7.8 Cr | 1,56,50,000 ₹1.6 Cr | 6,84,05,686 ₹6.8 Cr |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.7 Cr
Closing Date
20 Apr 2026, 3:00 pmClosed
O/o Executive Engineer (P) SR II,
O/o Executive Engineer (P) SR II, Room No. 307, Varunalaya Phase-I, Jhandewalan, Karol Bagh, Delhi-110 005
NIT No.18/EE (P) SR.II/ (2025-26)(Re-Invite)
2026_DJB_286731_1
NIT No.18/EE (P) SR.II/ (2025-26)(Re-Invite)
Open Tender
Composite Works
638 days
O/o Executive Engineer (P) SR II
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,500
DJB EMD A/c No. 50448339804 at Indian Bank,
₹3.7 Cr
in the office of Chief Engineer (DR)-PROJECTS-I,
15 May 2026
12 Feb 2026
20 Apr 2026
12 Feb 2026
20 Apr 2026
26 Feb 2026
25 Feb 2026
A) Design and Build Contract of various units for following:
a. Wastewater Pumping Stations – 38.25 MGD for Mitraon and 11.35 MLD for Jharoda
b. 17.0 MGD Capacity Wastewater treatment Plant Disposal Main up to Disposal point
c. K7 DI Pipe- (Open Cut) Length- 2200 Meter
d. K7 DI Pipe (Above Ground) Length- 100 Meter
e. MS Pipe (By Trenchless) Length- 200 Meter
f. K7DIPipe-(Open Cut)Length-400Meter
B) Operation and maintenance Cost
B-1 O&M cost for 15 years of Mitraon (Wastewater Pumping Stations –38.25 MGD and Wastewater Treatment Plant–17.0 MGD)
B-2 O&M cost for 15 years for 11.35MLD for Jharoda SPS
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_379701.xls
BOQ • 0.34 MB
Volume_I.pdf
Tender Documents • 2.50 MB
Volume_II.pdf
Tender Documents • 0.93 MB
Volume_III.pdf
Tender Documents • 1.17 MB
Volume_IV.pdf
Tender Documents • 2.60 MB
Volume_V.pdf
Tender Documents • 0.94 MB
Volume_VI.pdf
Tender Documents • 0.88 MB
Volume_VII.pdf
Tender Documents • 1.31 MB
Volume_VIII_Drawing_Soil_Investigation_Report_1208.pdf
Tender Documents • 36.12 MB
Download all tender documents and submit your bid