| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance AT MARKET LANE PO PS DIST KHORDHA | KHORDHA | ODISHA | 751001 | +0.00% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.7 CrAdmitted-Finance AT DUMDUMA KHANDAGIRI PO PS KHANDAGIRI BHUBANESWAR DIST KHORDHA ODISHA PIN 751019 | KHORDHA | ODISHA | 751019 | +0.00% | ₹1.7 Cr | L1 | Admitted-Finance |
| 3 | Rejected-Technical AT BDA COLONY LAXMISAGAR STAGE II BHUBANESWAR | - | - | - | Rejected-Technical Not fulfilled the criteria as per DTCN Clause No. 11 (a) |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
17 Mar 2026, 5:00 pmClosed
S.E. Electrical Circle (RandB) Bhubaneswar
S.E. Electrical Circle (RandB) Bhubaneswar, Nirman Soudha, Ubit-V, 751001.
Shifting of electrical utilities from Chandrabhaga Jucntion and Noliasahi due to development of Puri Konark Beach Front
2026_EICCL_125762_4
Bid Identification No.S.E.E.C (RandB) 28/2025-26
National Competitive Bid
Electrical Works
180 days
Puri
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.7 L
16 Apr 2026
27 Feb 2026
18 Mar 2026
27 Feb 2026
17 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
33kV 3C, 400sqmm UG Cable Supply of 33kV, 3Core, 400sqmm Aluminium, XLPE insulation UG Cable with spare (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-20kA)
Supply of Straight through jointing kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, aluminium UG Cable kits
Supply of Outdoor termination kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, HT UG Cable kits
Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 33kV UG cable
ERECTION Laying, Commissioning & Testing of 33kV, 3Core, 400sqmm, XLPE insulation (extruted type) UG cable with spare by open trench method.
Erection of Straight through jointing kits/Outdoor termination kits/ indoor termination Kits Heat Shrinkable type suitable for 33kV, 3Core, 400sqmm, aluminium UG Cable kits
Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.
Civil Earth work excavation of soil
Earth work excavation of hard rock
Back filling with excavated soil outside and above the trench
Supply and erection of GI Pipe of dia. 150mm, Class-B (8Mtr.)
Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works
Part - 1 :- 11kv O/H line length with 50 mtr span using 100 sq mm PSC pole 10meter long 330 kg
PSC Pole Clamp (GI)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)
Danger Plate, 1 no's.
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Wedge connector for 100 sqmm AAA conductor
Polycarbonate bird guard
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)
Black Paint
Yellow Colour Paint for Background
CIVIL and Service Works Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr
No. of Cut Point with 90 Degree Angle(Ref. Drawing No.- TPCODL-MVD-0005) H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)
11kV Line Length with 50 Mtr. Span using 100 SQ.MM. -AAA Conductor PSC pole 10meter long 330 kg
PSC Pole Clamp (GI)
11 KV V cross Arm (10.2 K.g. each )
Top bracket 100x50X6 mm GI channel (2kg each)
Danger Plate, 1 no's. for each pole
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
11 KV pin insulator polymer, 3 Nos. required for each support
Earthing of Support ( Coil Type )
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)
100 mm2 AAAC
Black Paint
Yellow Colour Paint for Background
Polycarbonate bird guard
Civil and services Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr
No. of DP required With AB Switch (Ref. Drawing No.- TPCODL-MVD-0001 WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)
Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 3 mtr., 2 no's channel required =( 2x9.56x3)
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)
AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =( 7.14x3x2)
AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)
Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 4 no's channel required =( 7.14x3x4)
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4)
Danger Plate, 2 no's.
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)
H.T. Stay set (Complete )
H.T. Stay Insulator Type-C
7/10 SWG Stay Wire 15kg /stay
Gi Pipe Earthing 40mm. 3 Mtr. Long
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)
Lightning Arrester(12KV,10KA) (Station Class,class-2)
AB Switch (11KV,400A.3pole,50Hz)
11 KV pin insulator polymer
H W fitting(B&S) 70KN, 3Bolt
Disc insulator (B&S) 70 KN polymer
Wedge connector for 100 sqmm AAA conductor
Polycarbonate bird guard
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)
Black Paint
Yellow Colour Paint for Background
Civil and services Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .
11 Kv Line Length In KM with 50 Mtr. Span (Ref. Drawing No.- TPCODL-MVD-0003) 9 Mtr. long 300 Kg. PSC Pole
LT Stay set Complete
7/12 SWG GI stay wire, Grade -2
LT stay Clamp ( 1.40Kg/pair)
LT Stay insulator
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)
EYE hook for XLPE Aerial bunched Cable
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable
Suspension Clamp with EYE hook for ABC
4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm
Pipe Earthing (each 5th pole to earth)
Coil Earthing
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing
Danger plate (LT)
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)
GI barbed wire anticlimbing device 3 Kg. Per support
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)
Black Paint
Yellow Colour Paint for Background
Civil and services Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .
11kV 3C, 400sqmm UG Cable Supply of 11kV, 3Core, 400sqmm Aluminium, XLPE insulation UG Cable with spare (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA-20kA)
Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG Cable kits
Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, HT UG Cable kits
Supply of materials for High Density Polyetheline (HDPE( piope 200mm diameter, PE 80-PN8 for laying of 11kV UG cable.
Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable
Erection of Straight through jointing kits/Outdoor termination kits/ indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG Cable kits
Installation, Laying, Comissioning & Testing of 11kV, 3Core, 400sqmm, XLPE insulation UG cable by HDD method with HDPE Pipe (200mm dia PE 80-PN8) including HDPE Pipe
Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.
Supply & erection of GI pipe of dia 150mm, class-B (8mtr.)
Supply & erection of cable route maker along the cable route at an interval of 3 months with civil work
1.1kv XLPE insulation armoured U/G cable along with Multimeter panel and Lt feeder pillar Supply of 1.1KV 4core 35 sqmm XLPE insulation armoured U/G cable along
ERECTION Installation, Laying, Comissioning & Testing of LT XLPE insulation UG cable by HDD method with HDPE Pipe (110mm dia PE 80-PN8) including HDPE Pipe
Supply and erection of double Compression flameproof type glanding for armoured Cable 3.5/4C 16-35 sqmm including making hole in Base plate and dressing of cab le along wiht vermin proofing properly supply to be done as per TPCODL Spec and approved make dowells
Dismantling Portion Dismentling of 9/8 Mtr PCC/ Joist Pole
Dismentling of 11/13 mtr Joist /WPB pole 150X150MM / 160X160MM
Dismentling of Various size LT AB CABLE
Dismentling of ACSR /AAAC 80/ 100mm2 form overhead line
Dismentling of ACSR /AAAC 34/ 55mm2 form overhead line N:B:. Salvage Value @ 8% to be deducted from the contractor's Bill.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_583482.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_583482.xls
BOQ • 0.47 MB
DTCN.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid