Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.6 LAccepted-AOC NO 31 A ANNA NAGAR SUBRAMANIYAPURAM TRICHY 20 | TRICHY | TRICHY | TAMIL NADU | 620020 | L1 | Accepted-AOC Agreement accepted | |
| 2 | L2₹69.5 L+₹4.8 L (7.47%)Rejected-AOC 2 209 1 NANGAVARAM ROAD PERUGAMANI POST SRIRANGAM TALUK TIRUCHIRAPPALLI | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | L2 | Rejected-AOC Rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Tender conditions not fulfilled |
| Sl No | Description | Qty | Unit | VASANTH ELECTRICALS L1 | GANAPATHY ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for supply , fixing and dismantling of 4'40 W patty Tube Light with fitting on existing support with connection.
(770 Nos x 2 Days) | 1,540 | Each /Days | 27 ₹41,580 Lowest | 29 ₹44,660 |
| 2.00 | Hire and labour charges for maintaining of 4'40 W patty Tube Light with fitting on existing support with connection.
(770 Nos x 13 Days) | 10,010 | Each /Days | 7 ₹70,070 Lowest | 7 ₹70,070 Lowest |
| 3.00 | Hire and labour charges for supply, fixing,and dismantling of Pedestal fan with connection.
(158 Nos x 2 Days) | 316 | Each /Days | 45 ₹14,220 Lowest | 48 ₹15,168 |
| 4.00 | Hire and labour charges for maintaining of Pedestal fan with connection.
(158 Nos x 13 Days) | 2,054 | Each /Days | 12 ₹24,648 Lowest | 12 ₹24,648 Lowest |
| 5.00 | Hire and labour charges for supply, fixing, and dismantling of Air cooler with stand with connection.
(32 Nos x 2 Days) | 64 | Each /Days | 152 ₹9,728 Lowest | 163 ₹10,432 |
| 6.00 | Hire and labour charges for maintaining of Air cooler with stand with connection.
(32 Nos x 13 Days) | 416 | Each /Days | 38 ₹15,808 Lowest | 41 ₹17,056 |
| 7.00 | Hire and labour charges for supply, fixing, and dismantling of 15A / 5A plug board with connection.
(726 Nos x 2 Days) | 1,452 | Each /Days | 27 ₹39,204 Lowest | 29 ₹42,108 |
| 8.00 | Hire and labour charges for maintaining of 15A / 5A plug board with connection .
(726 Nos x 13 Days) | 9,438 | Each /Days | 7 ₹66,066 Lowest | 7 ₹66,066 Lowest |
| 9.00 | Hire and Labour charges for supply , fixing ,and dismantling of 5 KVA UPS with 1 hour back up with suitable battery connection.
(13 Nos x 2 Days) | 26 | Each /Days | 8,433 ₹2,19,258 Lowest | 9,023 ₹2,34,598 |
| 10.00 | Hire and Labour charges for maintaining of 5 KVA UPS with 1 hour back up with suitable battery connection.
(13 Nos x 13 Days) | 169 | Each /Days | 2,108 ₹3,56,252 Lowest | 2,256 ₹3,81,264 |
Tender Value
₹64.6 L
EMD Value
₹42,300
Closing Date
16 Apr 2026, 11:00 amClosed
Superintending Engineer,PWD.,B(CandM)Circle,Trichy
Office of the Superintending Engineer, P.W.D., Buildings Construction and Maintenance, Circle, Trichy-1.
Providing Temporary Security Lighting,AC,PAS,Lightning,Generator, EB Connection Counting Centre Lalgudi,Manachannallur,Musiri,Thuraiyur (SC) Constituencies Election TNLA 2026 Oasys institute of tech Pulivalam Trichy
2026_PWD_675638_1
TN.No.01 /2026-2027/Dt.06.04.2026
Open Tender
Electrical Works
Lump-sum
30 days
Pulivalam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹42,300
27 Apr 2026
10 Apr 2026
16 Apr 2026
10 Apr 2026
16 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Hire and labour charges for supply , fixing and dismantling of 4'40 W patty Tube Light with fitting on existing support with connection.
(770 Nos x 2 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for maintaining of 4'40 W patty Tube Light with fitting on existing support with connection.
(770 Nos x 13 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for supply, fixing,and dismantling of Pedestal fan with connection.
(158 Nos x 2 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for maintaining of Pedestal fan with connection.
(158 Nos x 13 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for supply, fixing, and dismantling of Air cooler with stand with connection.
(32 Nos x 2 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for maintaining of Air cooler with stand with connection.
(32 Nos x 13 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for supply, fixing, and dismantling of 15A / 5A plug board with connection.
(726 Nos x 2 Days) | - | Each /Days | - | - |
| - | Hire and labour charges for maintaining of 15A / 5A plug board with connection .
(726 Nos x 13 Days) | - | Each /Days | - | - |
| - | Hire and Labour charges for supply , fixing ,and dismantling of 5 KVA UPS with 1 hour back up with suitable battery connection.
(13 Nos x 2 Days) | - | Each /Days | - | - |
| - | Hire and Labour charges for maintaining of 5 KVA UPS with 1 hour back up with suitable battery connection.
(13 Nos x 13 Days) | - | Each /Days | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Pulivalamelectioncondition.pdf
Tender Documents • 0.69 MB
BOQ_812022.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .