Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹78,025Accepted-AOC UPPER KULHI SINDRI ROAD JHARIA DHANBAD DHANBAD 828111 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828111 | ₹78,025 | 1 | Accepted-AOC L1 Bidder |
| 2 | Rejected-Technical OPPOSIT SHIV MANDIR BASTACOLA JHARIA ROAD DHANSAR DHANBAD DHANBAD 828106 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828106 | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical AT SINDRI ROAD UPPER KULHI P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | JHARKHAND | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SUN ENGINEERING WORKS L1 | J. P. TRADERS L3 | HARI OM ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Complete Reapiring/overhauling of self-starter , alternator and FIP Pump silencer box, operator seat , front wheel mud guard, propeller shaft, yoke, teeth cutting and welding of TATA TWL Payloader Registration nO. JH10AF7252 of Bastacolla Colliery , Bastacolla Area IX. | ||||||
| 1.01 | Complete Reapiring/overhauling of self-starter , alternator and FIP Pump silencer box, operator seat , front wheel mud guard, propeller shaft, yoke, teeth cutting and welding of TATA TWL Payloader Registration nO. JH10AF7252 of Bastacolla Colliery , Bastacolla Area IX.
Job to be done.
1. P/L self starter 24 Volt complete removing from M/C overhauling and repairing and fitting with materials.
2. P/L Alternator 24 Volt complete repairing and overhauling.
3. P/L Propeller shaft complete dismantling transmission side.
4. P/L Unloded valve dismantling and repairing and fitting.
5. P/L propeller shaft yoke & teeth complete cutting and welding and repairing setting and fitting.
6. Silencer box complete removing and denting and repairing and welding
7. end fitting. Front wheel mud guard denting and repairing and welding and setting
8. P/L front and rear mounting changing.
9. P/L operator seat upper and lower new making.
10. FI pump dismantling and repairing & overhauling opening fully and testing and machining fitting.
11. Fi pump nozzle repairing and setting & calibration with materials and fitting.
12. Wiper machine complete changing and fitting
Note:- Materials required for the job as per scope of work will be provided by the bidder. | 1 | Nos | 78,025 ₹78,025 | 79,500 ₹79,500 | 79,030 ₹79,030 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
Refer Docs
Closing Date
19 Mar 2024, 11:00 amClosed
Area Manager, Excavation
Office of the General Manager Excavation Department Vikash Bhawan, Bastacolla Area Office Area IX, BCCL, Dhanbad
Complete Reapiring/overhauling of self-starter , alternator and FIP Pump silencer boX
2024_BCCL_304887_1
BCCL/BA-IX/AM (Excvn)/E-Tender/23-24/148
Open Tender
Excavation Department Work
8 days
Bastacolla Colliery, Bastacolla Area IX
As Per NIT
3 documents required · 3 mandatory
Yes
8 Jun 2026
13 Mar 2024
20 Mar 2024
13 Mar 2024
19 Mar 2024
13 Mar 2024
13 Mar 2024 - 16 Mar 2024
Amount
Complete Reapiring/overhauling of self-starter , alternator and FIP Pump silencer box, operator seat , front wheel mud guard, propeller shaft, yoke, teeth cutting and welding of TATA TWL Payloader Registration nO. JH10AF7252 of Bastacolla Colliery , Bastacolla Area IX.
Complete Reapiring/overhauling of self-starter , alternator and FIP Pump silencer box, operator seat , front wheel mud guard, propeller shaft, yoke, teeth cutting and welding of TATA TWL Payloader Registration nO. JH10AF7252 of Bastacolla Colliery , Bastacolla Area IX. Job to be done. 1. P/L self starter 24 Volt complete removing from M/C overhauling and repairing and fitting with materials. 2. P/L Alternator 24 Volt complete repairing and overhauling. 3. P/L Propeller shaft complete dismantling transmission side. 4. P/L Unloded valve dismantling and repairing and fitting. 5. P/L propeller shaft yoke & teeth complete cutting and welding and repairing setting and fitting. 6. Silencer box complete removing and denting and repairing and welding 7. end fitting. Front wheel mud guard denting and repairing and welding and setting 8. P/L front and rear mounting changing. 9. P/L operator seat upper and lower new making. 10. FI pump dismantling and repairing & overhauling opening fully and testing and machining fitting. 11. Fi pump nozzle repairing and setting & calibration with materials and fitting. 12. Wiper machine complete changing and fitting Note:- Materials required for the job as per scope of work will be provided by the bidder.
Total impact of GST for the purpose of CTC
HARI OM ENTERPRISES
J. P. TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid