| Sl No | Description | Qty | Unit | G.ROBINSON L3 | A SHIBU L4 | RAJENDRAN T L1 | C SUBASH JOSE L2 |
|---|---|---|---|---|---|---|---|
| 1.00SIDE WALL | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 350 | sqm | 20.26 ₹7,091 | 20.63 ₹7,220.50 | 17.03 ₹5,960.50 | 17.23 ₹6,030.50 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 35 | each | 420.78 ₹14,727.30 | 428.5 ₹14,997.50 | 353.8 ₹12,383 | 357.86 ₹12,525.10 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 115.05 | cum | 287.05 ₹33,025.10 | 292.32 ₹33,631.42 | 241.36 ₹27,768.47 | 244.13 ₹28,087.16 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 88.5 | cum | 3,306.11 ₹2.9 L | 3,366.76 ₹3.0 L | 2,779.86 ₹2.5 L | 2,811.71 ₹2.5 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 28.05 | sqm | 430.27 ₹12,069.07 | 438.16 ₹12,290.39 | 361.77 ₹10,147.65 | 365.92 ₹10,264.06 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 217.47 | sqm | 935.5 ₹2.0 L | 952.67 ₹2.1 L | 786.59 ₹1.7 L | 795.61 ₹1.7 L |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 101.92 | cum | 9,547.92 ₹9.7 L | 9,723.11 ₹9.9 L | 8,028.13 ₹8.2 L | 8,120.11 ₹8.3 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,630.77 | kilogram | 125.26 ₹2.0 L | 127.56 ₹2.1 L | 105.32 ₹1.7 L | 106.53 ₹1.7 L |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.96 | cum | 8,839.01 ₹70,402.71 | 9,001.19 ₹71,694.48 | 7,432.06 ₹59,196.36 | 7,517.21 ₹59,874.58 |
Tender Value
₹16.9 L
EMD Value
₹42,342
Closing Date
25 Feb 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER Irrigation Division Tvpm
GENERAL KARAMANA RIVER BASIN Urgent side protection works to the right bank of Karamana River upstream of Kochupalam KWA Pump House Kundamankadavu in Vattiyoorkavu Constituency General Civil Work General Civil Work
2026_Irrig_839074_1
IRR/IA/TR/4571/2025_5_1_1/1
Open Tender
Civil Works - Others
180 days
Thiruvananathapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹42,342
5 May 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
SIDE WALL
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1413652.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.87 MB
BOQ_1413652.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid