Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-Finance NELLIMOOTTIL THOTTUVA MANAKKALA P O ADOOR | L1 | Accepted-Finance L1 | |
| 2 | L2₹27.0 L+₹54,046.79 (2.04%)Accepted-Finance HIMAHIRANS POCHAKONAM EZHUKONE PO KOLLAM | L2 | Accepted-Finance L2 | |
| 3 | L3₹27.4 L+₹99,574.84 (3.76%)Accepted-Finance PLAMPARAMPIL HOUSE MAROOR P O ENADIMANGALAM PATHANAMTHITTA | PATHANAMTHITTA | KERALA | 685533 | L3 | Accepted-Finance L3 | |
| 4 | L4₹28.4 L+₹2.0 L (7.52%)Accepted-Finance TENDER DOCUMENTS DO NOT CONTAIN THE FULL ADDRESS FOR THIS PRIVATE COMPANY | L4 | Accepted-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | Hiran mohan L2 | G.SASIDHARAKURUP L4 | RAJU THOMAS L3 | RAY THOMAS L1 |
|---|---|---|---|---|---|---|---|
| 1.00Perumkulam Karichal Ela | |||||||
| 1.00 | OD48140/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 1.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 12 | metre | 832.22 ₹9,986.64 | 876.94 ₹10,523.28 | 846.25 ₹10,155 | 815.55 ₹9,786.6 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 157.02 | cum | 244.49 ₹38,389.82 | 257.63 ₹40,453.06 | 248.61 ₹39,036.74 | 239.6 ₹37,621.99 Lowest |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 56 | hour | 432.58 ₹24,224.48 | 455.83 ₹25,526.48 | 439.88 ₹24,633.28 | 423.92 ₹23,739.52 Lowest |
| 1.00 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | 12 | Day | 1,026.99 ₹12,323.88 | 1,082.18 ₹12,986.16 | 1,044.3 ₹12,531.6 | 1,006.43 ₹12,077.16 Lowest |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 18.04 | cum | 718.89 ₹12,968.78 | 757.5 ₹13,665.3 | 731.01 ₹13,187.42 | 704.49 ₹12,709 Lowest |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 12.63 | cum | 1,628.37 ₹20,563.06 | 1,715.8 ₹21,667.12 | 1,655.82 ₹20,909.69 | 1,595.77 ₹20,151.38 Lowest |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 239.46 | cum | 3,789.79 ₹9,07,491.74 | 3,993.4 ₹9,56,247.58 | 3,853.69 ₹9,22,793.05 | 3,713.92 ₹8,89,324.14 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 519.2 | sqm | 366.47 ₹1,90,271.96 | 386.1 ₹2,00,463.89 | 372.64 ₹1,93,475.43 | 359.13 ₹1,86,461.01 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 78.5 | cum | 8,132.11 ₹6,38,395.03 | 8,569.14 ₹6,72,703.2 | 8,269.22 ₹6,49,158.58 | 7,969.3 ₹6,25,613.96 Lowest |
Tender Value
₹28.4 L
EMD Value
₹50,000
Closing Date
2 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
MIDIVISIONKOLLAM
DEPOSITImprovement of Irrigation facilities Perumkulam Karichal ela thodu in ward no16 of Mylom PanchayathGeneral Civil Work
2026_Irrig_858208_2
IRR/IA/TR/7272/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Mylom
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
18 Sept 2026
14 Aug 2026
5 Sept 2026
14 Aug 2026
2 Sept 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Perumkulam Karichal Ela | |||||
| 1.001 | OD48140/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 1.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | - | metre | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.004 | 60.2.7:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible | - | Day | - | - |
| 1.005 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - |
| 1.006 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.007 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.8 | cum | - | - |
| 1.008 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 0.8 | sqm | - | - |
| 1.009 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.2 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1464716.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 3.03 MB
BOQ_1464716.xls
BOQ • 0.23 MB
nit.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .