Tender Value
₹23.3 L
EMD Value
₹46,800
Closing Date
21 Apr 2026, 5:00 pmClosed
Executive Engineer
Minor Irrigation Division Dhanbad
Renovation of Madma Talab vill- Madma Panchayat- Madma Block- Nirsa ,Dist-Dhanbad
2026_WRD_112678_1
DMFT/MIR/DHN/F2-01/25-26/GR-04 (2nd Call)
Open Tender
Civil Works
Percentage
90 days
Nirsa
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹46,800
Yes
23 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in Borrow area, building premises flanks and slopes on the roads, canals and embankement by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I (Vide Item No. 5.1.3.1 Part - B/Part - A 2.02 | - | Ha. | - | - |
| 2 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with Kankar, Pebbles and Boulders up to 300 MM size and disposal of spoil up to 10 Mtr. With all lifts all complete as per specification and direction of E/I. (WRD 7.1.43.1) | - | M3 | - | - |
| 3 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with Kankar, Pebbles and Boulders up to 300 MM size and disposal of spoil up to 500 Mtr. With all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (WRD 7.1.43.2) | - | M3 | - | - |
| 4 | E/W in excavation in canal by the hydraulic excavator as per designed section in soft rock (where blasting is not needed),vide type of soil item -C With disposal of spoil up to 500 Mtr. With all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (Vide Item No. 7.1.43.6, Part - B, Pg. no. 138 | - | M3 | - | - |
| 5 | Hire Charges of 10 HP disel Operated pump for bailing out water from foundation trenches where necessary including cost of fuel , pay of operator with depriciation and major repair including profit (pump supplied by agency)- all complete as per direction of E/I { SOR Item code PM-29 pg 82 part A} | - | Hr. | - | - |
| 6 | Earth work in excavation of foundation trenches in ordinary soil (vide classiffication of soil item - A) and disposal of excavated earth so obtained to a distance up to 50 M and Av. lift of 1.5 M including leveling, ramming the foundation trenches removing the roots or shrubs etc. all complete as per specification and direction of E/I. (WRD. 7.1.27 ) | - | M3 | - | - |
| 7 | Providing Coarse Clean sand in filling in foundation trenches or in plinth including removing and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I.(Mode of measurement compacted volume). BCD 5.1.10 | - | M3 | - | - |
| 8 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.BCD-5.6.3 | - | M3 | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).BCD-5.3.1.4 | - | M2 | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).BCD 5.3.1.2 | - | M3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TERMCONDITION01.pdf
Tender Documents • 3.70 MB
BOQ_152144.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .