Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
5 Jan 2021, 2:00 pmClosed
SE ETC Shahjahanpur
Electy Trans Circle Shahjahanpur
Installation of 40MVA Transformer and other associated work at 132KV S/S Oyal under ETD Lakhimpur
2020_UPTCL_538638_1
64 ETC(S)/2020-21
Open Tender
Electrical Works
Fixed-rate
60 days
Lakhimpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹886
Yes
A/c No. 10998697090 IFSC Code No. SBIN0003085.
₹6,000
Yes
13 Jan 2021
17 Dec 2020
5 Jan 2021
17 Dec 2020
5 Jan 2021
17 Dec 2020
17 Dec 2020 - 4 Jan 2021
Amount
Dragging and shifting of 132/33KV 40MVA Transformer main tank from storage place alongwith radiators and bushings (approximate distance upto 20 Meters) including turning of Transformer if required including all T&P and all other works required to complete job satisfactorily.
Additional shifting for every 5 mtr. (45Meters)
Packing of Hv /LV Bushing of 40MVA transformer in wooden crater and proper binding for safe transportation
Loading of main tank of 40MVA transformer at 132Kv substation Lakhimpur by way of jacking main tank , placing wooden sleepers /planks under transformer tank continuous lifting the jack and placing 90Lb rail over sleeper bed till comes to height of trailed bed for loading to trailer bed from sleeper stacking and removal of sleeper . locking the main tank by sufficient strngth wire rope and turn buckle for safe transportation including loading of all accessories on trailer/ trucks with all safety and precautions.
Safe Transportation of transformer oil filled 40MVA transformer with all accessories e.g. consevator tank , radiators, Hv/Lv Bushings, RTCC Panel, transformer oil drums etc. on trailer/ truck safely from 132Kv Substation Lakhimpur to 132Kv Oel Lakhimpur distance about 25Km with due care and safety precautions including transeient isurance which shall be rembursed as per actual.
Unloading of main tank of 40MVA transformer at 132Kv substation Oyal by way of opening lacing of main tank and jacking main tank placing rail under the tank and stacking wooden sleepers /planks side to trailer , draging tank from trailer bed to sleeper bed and removal of rail from beds and lowering down main tank by removal of sleeper layers one by one with help of jack and placing the tank on rail at grounf lelel. unloadingall other accessories from traler/trucks and stacking to designated place at 132Kv Substation Oel under construction with all safety and precautions.
Dragging and shifting of 132/33KV 40MVA Transformer main tank to transformer plinth alongwith radiators and bushings (approximate distance upto 20 Meters) including turning of Transformer if required including all T&P and all other works required to complete job satisfactorily.
Additional shifting for every 5 mtr. (75Meters)
Replacement of Gasket of all gaskets including Top Cover, Hv Lv Bushings , inspection holes etc of transformer by providing and fixing of new gaskets as per existing size made of rubberised cork sheet of Kotika Turboze/ Nu cork brand grade 07
Preeti Enterprises
Omurmila Constructions
Ajanta Engineering works
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .