| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 LRejected-AOC | ₹4.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAJEESH P L2 | AJITHKUMAR S. L1 |
|---|---|---|---|---|---|
| 1.00Pazhayannur LIS | |||||
| 1.00 | OD247431/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed. | 1 | job | 7,616.17 ₹7,616.17 | 7,252.12 ₹7,252.12 |
| 1.00 | OD247432/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories ,panel board etc including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed. | 1 | job | 30,540.64 ₹30,540.64 | 29,080.79 ₹29,080.79 |
| 1.00 | OD247433/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 3 | job | 26,723.56 ₹80,170.68 | 25,446.17 ₹76,338.51 |
| 1.00 | OD75291/2025-2026:Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 1,055.64 ₹1,055.64 | 1,005.18 ₹1,005.18 |
| 1.00 | OD75298/2025-2026:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 6 | each | 8,638.89 ₹51,833.34 | 8,225.95 ₹49,355.70 |
| 1.01 | OD75292/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. | 1 | each | 845.33 ₹845.33 | 804.93 ₹804.93 |
| 1.01 | OD75299/2025-2026:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. | 6 | each | 5,896.71 ₹35,380.26 | 5,614.85 ₹33,689.10 |
| 1.01 | OD75296/2025-2026:Dismantling the61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint. | 2 | each | 6,771.52 ₹13,543.04 | 6,447.84 ₹12,895.68 |
| 1.01 | OD75302/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition. | 2 | each | 3,907.09 ₹7,814.18 | 3,720.33 ₹7,440.66 |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
28 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Pazhayannur and Arackamala LIS Fully Comprehensive Annual Maintenance Contract for the year 2025 26 General Electrical Work
2026_Irrig_827554_19
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
₹10,593
4 Apr 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Pazhayannur LIS
OD247431/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247432/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories ,panel board etc including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed.
OD247433/2025-2026:Fully Comprehensive Annual Maintenance of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD75291/2025-2026:Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD75298/2025-2026:Lowering down and erecting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD75292/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD75299/2025-2026:Lifting the 61-110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD75296/2025-2026:Dismantling the61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD75302/2025-2026:Dismantling the 61-110 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD84840/2025-2026:Overhauling 61-110HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Arackamala LIS
OD247434/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD247435/2025-2026:Fully Comprehensive Annual Maintenance of 11-30 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories ,panel board etc including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed.
OD247436/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD75308/2025-2026: Lowering down and erecting upto 1-3 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD75309/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD75310/2025-2026: Lifting the upto 1-3 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD75311/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD75306/2025-2026:Dismantling the11-30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD75315/2025-2026:Dismantling the 11-30 HP starters by parts draining out the oil, cleaning the tank, terminal contacts, cutting, leveling and polishing the contacts, cleaning contacts wherever necessary, checking the tripping mechanism, replacing the damaged wires, attending minor repairs, cleaning the oil, (in case of oil starters), refitting, resetting and making the starter in good working condition.
OD86855/2025-2026:Overhauling 11-30HP split case pump, dismantling the pump, overhauling the same, taking out the impeller shaft assembly, detaching impeller shaft assembly, reconditioning the impeller and shaft, reconditioning the worn-out shaft and impeller by welding, metaling, cutting, grinding if necessary and dynamically balancing including providing coupling bolt, replacing the bearing etc. refitting the same in pump.
Common Items
OD86810/2025-2026: Replacing old bearing and supply new bearing bearing no 6308 SKF/FAG OR equivalent
OD258458/2025-2026:Replacing old bearing and supply new bearing bearing no 6310SKF/FAG OR equivalent
OD86806/2025-2026: Replacing old bearing and supply new bearing bearing no 6313 SKF/FAG OR equivalent
OD86804/2025-2026: Replacing old bearing and supply new bearing bearing no 6315 SKF/FAG OR equivalent
OD86814/2025-2026:Conveyance charge of 20-120 HP motor / pump / panel board / starter board etc pump house to workshop and bring back to pump house.
OD258456/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1389625.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.47 MB
BOQ_1389625.xls
BOQ • 0.32 MB
Pazhayannur11616NITSBDmerged.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid