Tender Value
₹14.2 Cr
EMD Value
₹5 L
Closing Date
30 Mar 2026, 11:15 amClosed
Chief Engineer, KIIDC
KWA Campus, Vellayambalam, Thiruvananthapuram
This proposal is about providing CMI in the ayacut areas of Moolathara Right Bank Canal (MRBC) extension from Korayar to Varattayar. The project area is situated in the rain shadow region of Palakkad gap
2026_KIIDC_833031_2
KIIDC/TR/7721/2025_12_1_1/1
Limited
Civil Works - Lift Irrigation Schemes
Item Rate
365 days
Palakkad
Please refer bid document
6 documents required · 6 mandatory
₹19,518
₹5 L
KIIDC Office Trivandrum
31 Mar 2026
14 Mar 2026
31 Mar 2026
14 Mar 2026
30 Mar 2026
14 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - Providing Submain works | |||||
| 1.001 | OD38625/2025-2026:1. DESIGN, SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF SUB-MAIN MICRO-IRRIGATION SYSTEM AS PER THE IS SPECIFICATIONS AND APPROVED DESIGN FROM KIIDC DESIGN WING INCLUDING ALL SUBMAIN PVC PIPELINES-IND, PLACING EMITTER TAKE-OFF AND FITTINGS, ACCESSORIES, FLUSH VALVES(UV PROTECTED), IRRIGATION CONTROL VALVES(UV PROTECTED), AND FITTINGS AND ACCESSORIES,PRESSURE TESTING OF SUBMAIN PIPE LINES AND JOINTS AS PER THE GUIDLINES OF KIIFB/KWA, SUPPLY OF SPARE PARTS, TOOLS ETC WITH ALL COST OF MATERIALS, LABOUR CHARGES, COST OF FITTINGS, CONVEYANCE INCLUDING ALL COST OF TRENCHING, BACKFILLING, AND LAYING AS PER DESIGN ALIGNMENT AND LEVELS, IF ANY, ETC, INCLUDING MATERIAL TEST REPORT FROM THE THIRD PARTY MATERIAL QUALITY CONTROL UNIT, AS PER THE SPECIFICATIONS AND DIRECTIONS OF DEPARTMENTAL OFFICERS AT SITE. | 1,26,239 | cent | - | - |
| 2Appendix B - Providing Main Line works | |||||
| 2.001 | OD38626/2025-2026:2. DESIGN, SUPPLY, AND INSTALLATION, TESTING AND COMMISIONING OF MAINLINE MICRO-IRRIGATION SYSTEM AS PER THE IS SPECIFICATIONS AND APPROVED DESIGN FROM KIIDC INCLUDING MAIN LINE PVC PIPES,FERTIGATION UNIT(UV PROTECTED), IRRIGATION CONTROL VALVES FOR MAINLINE,PRESSURE TESTING OF MAIN PIPE LINES AND JOINTS AS PER THE GUIDLINES OF KIIFB/KWA, FITTINGS AND ACCESSORIES, SUPPLY OF SPARE PARTS, TOOLS,PRESSURE TESTING OF LAID PIPE LINES ETC WITH ALL COSTS OF MATERIALS, LABOUR CHARGES, COST OF FITTINGS, CONVEYANCE INCLUDING ALL COSTS OF TRENCHING, BACKFILLING, AND LAYING AS PER DESIGN ALIGNMENT AND LEVELS IF ANY, ETC INCLUDING, MATERIAL TEST REPORT FROM THE THIRD PARTY CONTROL UNIT,(COST FOR ROAD CUTTING & UTILITY SHIFTING IS EXCLUDED) AS PER THE SPECIFICATIONS AND DIRECTIONS OF DEPARTMENTAL OFFICERS AT THE SITE. | 1,26,239 | cent | - | - |
| 3Appendix C - Providing Automation Works | |||||
| 3.001 | OD38627/2025-2026:SURVEY, DESIGN, INSTALLATION AND TESTING OF FULLY AUTOMATED
COMMUNITY MICRO IRRIGATION SYSTEM WITH ELECTRONICALLY
CONTROLLED VALVES IN THE PROJECT AREA INCLUDING CONDUCTING
CONTOUR SURVEY, INDIVIDUAL FARM BOUNDARY SURVEY,
PREPARATION OF DESIGN AND DRAWINGS, PREPARATION OF
OPERATION MANUAL,SUBMISSION OF MATERIAL APPROVAL
REQUEST(THE CONTRACTOR HAS TO SUBMIT THE MATERIAL APPROVAL
REQUEST BEFORE COMMERSSING THE WORK), SUBMISSION OF WORK
SCHEDULE, FORMATION OF WATER USERS ASSOCIATION, TRAINING TO
THE FARMERS ON MODERN FARMING TECHNICS, WATER
CONSERVATION, VALUE ADDITION,LIVESTOCK DEVELOPMENT AND
DOCUMENTING ALL TRAININGS , SUITABLE PUMP OF ADEQUATE
DESIGN CAPACITY WITH STANDBY AND ACCESSORIES FOR SUCTION
AND DISCHARGE,COMMISSIONING OF HEAD UNIT INCLUDING COST OF
RELATED ALL ACCESSORIES SUCH AS PRIMARY FILTRATION,
SECONDARY FILTRATION,(SUITABLE AVAILABLE WATER SOURCES
SUCH AS PONDS RENOVATED AND WATER FEDDED IN MRBC PHASE-2
CIVIL WORKS & RIVERS CAN BE UTILIZED, THE FILTERS SHALL BE
SUITABLE FOR GROUNDWATER OR SURFACE WATER ACCORDING TO
THE SITE CONDITION), FEEDERMAIN FROM FILTERS, SOLENOID VALVES,
PRESSURE RELEASE VALVES, PRESSURE GAUGES, SAFETY
ACCESSORIES, DRIP SYSTEM WITH PC EMITTERS OF MAXIMUM 3
LPH DISCHARGE HAVING EMITTER TO EMITTER SPACING, SELFFLUSHING AND CONTINUOUS SELF-CLEANING
MECHANISM, IDEAL FOR PERMANENT CROPS IN COMPLEX
TOPOGRAPHY AND SUB SURFACE APPLICATIONS, RESISTANT TO
STANDARD NUTRIENTS USED IN AGRICULTURE, DRIP MANIFOLD
ACCESSORIES,QUICK RELIEF VALVE,NRV, MCU SYSTEM WITH ALL
OTHER ACCESSORIES(MCU SHOULD BE SCADA SCREEN WITH REAL TIME
STATUS OF OUTPUTS AND SENSORS READING, COLOR DISPLAY, TOUCH
SCREEN WITH RESOLUTION - 1280 * 800, CAPABLE OF WIRELESS
OPERATION, INBUILT GLOBAL SIM, OPTION OF INTERNET CONNECTION
VIA LOCAL SIM & LAN, MULTIPLE USERS ACCESS WITH HIERARCHY
BASED ON DIFFERENT ROLES, DOWNLOADABLE USER REPORTS -
IRRIGATION -FERTIGATION REPORTS WITH CUSTOM TIME PERIOD,
CREATE AND VIEW IRRIGATION BLOCKS , MULTI MAINLINE OPERATION
(UP TO 4 MAINLINES), REMOTE ACCESS THROUGH WEBVIEW AND
MOBILE APP WITH PASSWORD PROTECTION, MONITOR IN-FIELD
IRRIGATION STATUS BY SOIL
MOISTURE SENSORS WITH GRAPHICAL ANALYSIS , CAN BE
OPERATABLE FROM ANYWHERE WITH MULTI LOGIN ACCESS), WATER
METER CONNECTABLE TO MCU,RTU UNIT WITH SOLAR PANEL AND ALL
OTHER ACCESSORIES , SOIL MOISTURE SENSORS, SOIL TESTING AT THE
FREQUENCY AS REQUIRED, AND THE CONTRACTOR HAS TO ESTABLISH
PROVISIONS FOR UTILIZING THEIR AVAILABLE IRRIGATION SYSTEMS
ON INDIVIDUAL FARMER FIELDS BY LINKING WITH THIS PROJECT
WHERE THE FARMERS ARE WILLING,PRESSURE TESTING OF MAIN LINES
AND SUBMAINS AS PER THE GUIDELINES OF KIIFB/KWA,CONTRACTOR
HAS TO DIPLOY EXPERIENCED AGRICULTURAL ENGINEER, MACHINERY
AND EQUIPMENT FOR EXECUTION, QUALITY CONTROL
ARRANGEMENTS, PREPARATION&SUBMISSION OF PRODUCTION
PLAN, CADASTRAL MAP, LAND USE MAP, GEOMORPHOLOGY MAP &
OBTAINING CONSENT FROM FARMERS FOR LAYING PIPES AND ALLIED
WORKS IN THEIR PROPERTY WITH THE ASSISTANCE OF KIIDC STAFF,
MARKET STUDY, FORMING FARMERS ASSOCIATION AND ADVISING
FARMERS ON CROP SELECTION BASED ON WATER AVAILABILITY,
MARKET STUDY,AND ALL MATERIALS, FITTINGS, ADHESIVES SHALL BE
AS PER THE SPECIFICATIONS AND STANDARDS OF BIS/INTERNATIONAL
CODES, INCLUDING OPERATION AND MAINTENANCE FOR THREE YEARS
AS MENTIONED IN THE TENDER DOCUMENTS(THE CONTRACTOR HAS TO
DIPLOY EXPERIENCED TECHNISION FOR THREE YEARS MAINTANANCE
FROM THE DATE OF PROJECT COMMISSIONING).PREPARATION OF ALL
DOCUMENTS FOR ELECTRICITY CONNECTION. | 1,26,239 | cent | - | - |
| 4Appendix-D PUMP ROOM | |||||
| 4.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 81 | cum | - | - |
| 4.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.05 | cum | - | - |
| 4.003 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.4 | cum | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.31 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.15 MB
Tendernotice_5.pdf
PDF • 0.36 MB
BOQ_1432631.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .