| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAdmitted-Finance VILL BHAJNAI POST RAJPUR KALA TEHSIL ANOLA DISTT BAREILLY UP 243302 | BAREILLY | BAREILLY | UTTAR PRADESH | 243302 | ₹32.6 L | L1 | Admitted-Finance |
| 2 | L2₹40.1 L+₹7.5 L (23.0%)Admitted-Finance C 247 1 RAJINDRA NAGAR BAREILLY 243122 UP | BAREILLY | UTTAR PRADESH | 243122 | ₹40.1 L+₹7.5 L (23.0%) | L2 | Admitted-Finance |
| 3 | L3₹41.8 L+₹9.2 L (28.4%)Admitted-Finance INDEX NO D 302 CC MOHALLA KANOON GOYAN BUKHARA FARIDPUR ROAD DAYAL CLINIC KANOONGOYAN MOHALLA FARIDPUR BAREILLY UP 243503 | BAREILLY | BAREILLY | UP | 243503 | ₹41.8 L+₹9.2 L (28.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Gupta Builders L2 | NETRAPAL SINGH L1 | KUSH TOMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer - in - Charge. | 983.95 | Sqm | 25 ₹24,598.75 | 20 ₹19,679 Lowest | 20 ₹19,679 Lowest |
| 2.00 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises | 397 | Sqm | 25 ₹9,925 | 20 ₹7,940 Lowest | 20 ₹7,940 Lowest |
| 3.00 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. | 3.5 | Xsqm | 200 ₹700 Lowest | 200 ₹700 Lowest | 800 ₹2,800 |
| 4.00 | Demolition of Concrete is ground floors andy pavings n exc 15 cm thickness (below or above ground level)complete all as specified and directed by Engineer-in-Charge. | 6.53 | Cum | 150 ₹979.5 Lowest | 500 ₹3,265 | 230 ₹1,501.9 |
| 5.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 8 | Cum | 150 ₹1,200 Lowest | 200 ₹1,600 | 300 ₹2,400 |
| 6.00 | Demolition of concrete of any description and in any position not otherwise specifically provided complete all as specified and directed | 5.5 | Cum | 150 ₹825 Lowest | 500 ₹2,750 | 300 ₹1,650 |
| 7.00 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 18 | Each | 100 ₹1,800 Lowest | 120 ₹2,160 | 500 ₹9,000 |
| 8.00 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 20 | Each | 90 ₹1,800 Lowest | 150 ₹3,000 | 400 ₹8,000 |
| 9.00 | Dismantling of 100mm bore cast iron/ pvc drain pipe alongwith fittings and accessories jointed in cement mortar and taking out from walls, floors or from trenches, if required complete all as specified and directed. | 40 | RM | 25 ₹1,000 Lowest | 70 ₹2,800 | 40 ₹1,600 |
| 10.00 | Taking down eaves gutters and rainwater pipes 75 mm dia , including all fittings, heads, shoes, bends, swan-necks, etc.,including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fitting and accessories) | 60 | RM | 25 ₹1,500 Lowest | 150 ₹9,000 | 40 ₹2,400 |
Tender Value
₹45.1 L
EMD Value
₹90,300
Closing Date
2 Sept 2026, 6:00 pmClosed
GE (EAST) BAREILLY
GE (EAST) BAREILLY, NEAR SHAHJAHANPUR ROAD BAREILLY
8554/E8 SPL REPAIR TO BLDG NO T-16, P-127, P-138, P-141, P-142 OF 116 ENGR REGT AND 306 FD HOSP AND BLDG NO P-163 JCOs SINGLE LIVING ACCN OF 406 FD HSOP AND SPL REPAIR TO TOILET/BATH ROOM OF 6 MDSR UNDER GE (EAST) BAREILLY
2026_MES_782881_1
8554/E8
Open Tender
Civil Works
Item Rate
180 days
GE (EAST) BAREILLY
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
GE (EAST) BAREILLY
₹90,300
Yes
16 Sept 2026
5 Aug 2026
9 Sept 2026
5 Aug 2026
2 Sept 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer - in - Charge. | 983.95 | Sqm | - | - |
| 2 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises | 397 | Sqm | - | - |
| 3 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. | 3.5 | Xsqm | - | - |
| 4 | Demolition of Concrete is ground floors andy pavings n exc 15 cm thickness (below or above ground level)complete all as specified and directed by Engineer-in-Charge. | 6.53 | Cum | - | - |
| 5 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 8 | Cum | - | - |
| 6 | Demolition of concrete of any description and in any position not otherwise specifically provided complete all as specified and directed | 18.75 | Cum | - | - |
| 7 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) removing from site complete all as specified and directed by Engineer-in-Charge. | 92 | Each | - | - |
| 8 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 20 | Each | - | - |
| 9 | Dismantling of 100mm bore cast iron/ pvc drain pipe alongwith fittings and accessories jointed in cement mortar and taking out from walls, floors or from trenches, if required complete all as specified and directed. | 90 | RM | - | - |
| 10 | Taking down eaves gutters and rainwater pipes 75 mm dia , including all fittings, heads, shoes, bends, swan-necks, etc.,including cleaning or refixing or removal to Store (measured overall as fixed along the centre line over fitting and accessories) | 150 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_877119.xls
BOQ • 3.60 MB
Tender8554.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .