Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 15 55 237 A NEAR MANDI SAMITI GATE MANDI GATE MAJHOLA MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.0 L
EMD Value
₹2,000
Closing Date
14 Dec 2022, 12:00 pmClosed
EE ETD AMROHA
EE ETD AMROHA
WORK OF OVERHAULING AND TIME MEASUREMENT OF 245 KV SF-6 CIRCUIT BREAKER (CGL MAKE) INSTALLED AT 220 KV S/S AMROHA AND WORK OF ERECTION OF PI ON ALP STRUCTURE AT VARIOUS LOCATIONS AT 132 KV S/S AMROHA UNDER ETD AMROHA.
2022_UPTCL_754534_1
E-T-11/ETD/AMROHA/2022-23
Open Tender
Electrical Works
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD AMROHA
₹2,000
24 Dec 2022
30 Nov 2022
14 Dec 2022
30 Nov 2022
14 Dec 2022
30 Nov 2022
Amount
WORK OF overhauling & Time Measurement of 245 KV SF-6 circuit breaker (CGL make) installed at 220 KV S/S Amroha and work of erection of PI on ALP structure at various locations at 132 KV S/S Amroha under ETD Amroha
During S/D of 220 KV SF-6 Circuit Breaker (Bay No. 206) at 220 KV S/S Amroha following works to be carried out : CB closing/tripping timing measurement for TC-1, TC-2 and CC by a suitable time measurement kit having proper accuracy & calibration. Measurement of time for C-O operation time of CBs Measurement of contact resistance of moving & fixed contacts by suitable CRM kit. If required adjustment in tripping/closing time pole mechanism is to be adjusted by alignment of ratchet wheel, control valve assembly, cleaning of cap seal cylinder, reassembly, de-rusting & other associated works for proper tripping and closing time of CB alongwith submission of complete test reports.
Errection of 132KV Post insulators along with ALP structure, the work includes shifting of structure and PI from store to site, proper shorting and stacking of structure, fabrication/ mounting the PI on base plate, tightening of nut bolts etc.
Making proper sag of existing jumpers including work of opening of required Isolator clamps/ PG clamps and cutting the extra jumper, adjusting the spacers, tightening the PI clamps and retightening the Isolator clamps/ PG clamps.
Making earthing of various substation main and auxiliary structure including work of digging the earth till earthmat making joint of 50X6mm MS flat to 40mm existing MS round and backfilling of earth
NAVEEN AND COMPANY
TECHNO POWER ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid