| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | ₹18.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.0 LRejected-AOC | ₹19.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹19.7 LRejected-AOC | ₹19.7 L | L3 | Rejected-AOC L3 |
| 4 | L4₹20.1 LRejected-AOC | ₹20.1 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | REGI T I L3 | K. K. YACOB L1 | P V BABYCHAN L2 | BABY M J L4 |
|---|---|---|---|---|---|---|---|
| 1.00CULVERT | |||||||
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 3 | cum | 720.12 ₹2,160.36 | 676.95 ₹2,030.85 | 696.87 ₹2,090.61 | 735.63 ₹2,206.89 |
| 1.00 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 1.89 | cum | 482.36 ₹911.66 | 453.43 ₹856.98 | 466.78 ₹882.21 | 492.74 ₹931.28 |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 96.96 | cum | 58.66 ₹5,687.67 | 55.14 ₹5,346.37 | 56.76 ₹5,503.45 | 59.92 ₹5,809.84 |
| 1.00 | 3.13.2.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary Rock (not requiring blasting) - Mechanical Means | 16.72 | cum | 71.35 ₹1,192.97 | 67.07 ₹1,121.41 | 69.04 ₹1,154.35 | 72.88 ₹1,218.55 |
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 15 | cum | 46.25 ₹693.75 | 43.47 ₹652.05 | 44.75 ₹671.25 | 47.24 ₹708.60 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 25.38 | cum | 6,807.77 ₹1.7 L | 6,399.59 ₹1.6 L | 6,587.93 ₹1.7 L | 6,954.33 ₹1.8 L |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 76.38 | cum | 8,567.23 ₹6.5 L | 8,053.56 ₹6.2 L | 8,290.57 ₹6.3 L | 8,751.67 ₹6.7 L |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 5.51 | MT | 93,533.59 ₹5.2 L | 87,925.6 ₹4.8 L | 90,513.13 ₹5.0 L | 95,547.23 ₹5.3 L |
| 1.01 | 13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. | 28.22 | cum | 3,493.69 ₹98,591.93 | 3,284.22 ₹92,680.69 | 3,380.87 ₹95,408.15 | 3,568.9 ₹1.0 L |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
12 Nov 2025, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads division, Kakkanad, Trikkakara. P.O, 682021
GENERAL SR 2025 26 Reconstruction of Damaged culverts in Manjapra Vadakkumbhagam road at Ch4/950 and at Ch5/050 General Civil Work
2025_PWD_812120_2
PWD/RB/TR/9478/2024_5_1_1/1
Open Tender
Civil Works - Roads
150 days
Kakkanad
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
27 Jan 2026
3 Nov 2025
14 Nov 2025
3 Nov 2025
12 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1371930.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 3.46 MB
nit.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid