| 1 | L1₹5.3 LAdmitted-Finance | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 LAdmitted-Finance | ₹5.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GOODWILL ELECTRICALS L1 | ABDUL AHAD RAINA L2 |
|---|---|---|---|---|---|
| 1.01 | Supply, Installation, testing & Commissioning of 63 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate | 1 | Nos | 1,10,000 ₹1.1 L | 1,50,000 ₹1.5 L |
| 1.02 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 33] | 13 | Nos | 1,95,000 ₹1.9 L | 1,69,000 ₹1.7 L |
| 1.03 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 15] | 1 | Nos | 13,000 ₹13,000 | 8,000 ₹8,000 |
| 1.04 | Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of 0.03 ACSR Conductor | 1.6 | Km | 56,000 ₹56,000 | 48,000 ₹48,000 |
| 1.05 | Providing & fixing of GI Channel cross-arm (100 x 50x6mm) / 75x40x40 x6mm including back clamps of 50X8 mm for fixing Cross arm and pole top bracket, Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . . | 404 | Kgs | 54,540 ₹54,540 | 52,520 ₹52,520 |
| 1.06 | Supply,installation, testing and commissioning of 11 KV Polymeric Composit pin with insulator insulator 12 KV, 5 KN,Light Impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm | 39 | Nos | 9,750 ₹9,750 | 11,700 ₹11,700 |
| 1.07 | Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9kV, 10KA LA with polymer housing, station type. | 1 | Set | 3,000 ₹3,000 | 2,000 ₹2,000 |
| 1.08 | Supply,installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 2,500 ₹2,500 | 2,000 ₹2,000 |
| 1.09 | Supply,installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole,200 Amp, Vertical Type | 1 | Set | 11,000 ₹11,000 | 15,000 ₹15,000 |
| 1.10 | Supply,installation, testing and commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type | 40 | Mtr | 10,000 ₹10,000 | 14,000 ₹14,000 |
Tender Value
₹5.8 L
EMD Value
₹11,600
Closing Date
6 Mar 2026, 4:00 pmClosed
Ex Engineer ED Ganderbal
Office of the Ex Engineer ED Ganderbal
Installation of New 63KVA Transformer at Peth Khanan Nard at Khanan
2026_PDD_303500_1
EDG/V/118 OF 2025-26
Open Tender
Electrical Works
20 days
GANDERBAL
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Ex Engineer ED Ganderbal
₹11,600
7 Mar 2026
16 Feb 2026
7 Mar 2026
16 Feb 2026
6 Mar 2026
16 Feb 2026
16 Feb 2026 - 17 Feb 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Executive Engineer, Electric Division Ganderbal
Name of Work: Installation of New 63KVA Transformer at Peth Khanan Nard at Khanan.
NIT No: EDG/V/ 118 of 2025-26; Dated: 16.02.2026
Sl.No Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Rate Inclusive of all taxes & duties Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Supply, Installation, testing & Commissioning of 63 kVA 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound , and with LV Cable Box having detachable Aluminium Gland plate item1 1 Nos Excess(+) Full Conversion INR
Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 9 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 33] item2 13 Nos Excess(+) Full Conversion INR
Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles with pit excavation [IS 2713 410 SP 15] item3 1 Nos Excess(+) Full Conversion INR
Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and Laying of 0.03 ACSR Conductor item4 1.6 Km Excess(+) Full Conversion INR
Providing & fixing of GI Channel cross-arm (100 x 50x6mm) / 75x40x40 x6mm including back clamps of 50X8 mm for fixing Cross arm and pole top bracket, Angle Pole Top Bracket (50x50x6 mm) including back clamps of 50X8 mm for fixing Cross arm and pole top bracket . . item5 404 Kgs Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of 11 KV Polymeric Composit pin with insulator insulator 12 KV, 5 KN,Light Impulse 75 KVPositive and 80 KV Negative ,Creepage distance 320 mm item6 39 Nos Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of Gapless Surge Arrestor, 9kV, 10KA LA with polymer housing, station type. item7 1 Set Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A item8 1 Set Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole,200 Amp, Vertical Type item9 1 Set Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of 185 mm² Single-Core Cable, 1.1kV Grade, XLPE un armoured FRLS type item10 40 Mtr Excess(+) Full Conversion INR
Providing & Painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint) item11 14 Nos Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of Galvanized Nuts and Bolts of sizes. item12 25 Kgs Excess(+) Full Conversion INR
Providing & Laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum per pole for ( 8 Mtr) item13 1 Nos Excess(+) Full Conversion INR
Providing & Laying of Cement bottoming 1:2:4 mix as per Standards 0.45 cum per pole for ( 9 Mtr) item14 13 Nos Excess(+) Full Conversion INR
Providing & fixing of Earthing Complete by GI Pipe 40 mm 3 mtr long through GI Strip 25x3 mm item15 14 Nos Excess(+) Full Conversion INR
Providing & Laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm No.minal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover item16 3 Nos Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of LT Fuse Set item17 1 Nos Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of 16 KN Polymer Shackle Insulators LT item18 4 Nos Excess(+) Full Conversion INR
Supply,installation, testing and commissioning of GI Mukey for Shackle Insulator with Bolt of (50x6)mm item19 4 Nos Excess(+) Full Conversion INR
Sundry Items like Aluminium Lugs, Jumpers, Binding Tape item20 1 Ls Excess(+) Full Conversion INR
Providing of Stencil and Spray Painting (Black in Colour) on each Pole at an height of 4.5 feet above ground levelwith following specification: 1.The Dimension of the Stensil should be not less than 21"x9" per pole. 2.The following details are to be recorded on each pole with the Spray paint. a). Name of the Work b)Year c). name of the Contractor d). SR of the pole The said Stensil should be approved by EDV Ganderbal item21 Nos Excess(+) Full Conversion INR
Pre and Post Geo tagged Photographic Evidence consisiting of 5x7 inch Photographs and Autocad Single Line Diagram item22 Job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Quoted Rate in Words
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_985474.xls
BOQ • 0.33 MB
TECH1.pdf
Tender Documents • 13.93 MB
SBD118.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid