Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,600
Closing Date
2 Sept 2026, 6:00 pm
EXEN REW BARAMULLA
EXEN REW BARAMULLA
Fencing With gate of masjid Al Noor at Duroo A UNDER ADP PRI GRANTS FOR THE 2026-27 Block -Zaingeer
2026_RDPR_320826_16
199 Xen/Rew/Bla/2026-27 Dated 13/08/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,600
13 Aug 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
2 Sept 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches drains (not exceeding 1.5m in width as well as 10 Sqm in plan ) including dressing of slides and ramming of bottoms, lift up to 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed. | 2.62 | cum | - | - |
| 2 | P/L of dry stone solling hand packed in foundation inc Carriage by Mt 10 kms | 2.42 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.04 | cum | - | - |
| 4 | Brick work with common burnt clay (non-modular) bricks of designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 2.28 | cum | 1 | ₹2.28 |
| 5 | extra for brickwork | 0.9 | cum | - | - |
| 6 | Providing and hoisting of structural steel work in fencing (complete job) | - | kgs | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundation | 36.6 | sqm | - | - |
| 8 | PL OF 12 MM CEMENT SAND PLASTER IN 1:6 MIX | 45.6 | sqm | - | - |
| 9 | Painting steel work with red oxide primer and two coats of synthetic enamel complete job | - | sqm | 1 | - |
| 10 | Carriage of materials from source to site of work by mechanical transport;Sand/ aggregate from avg lead 25 kms | 8.43 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1068016.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].