| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.0 CrAccepted-AOC | ₹3.0 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.1 Cr+₹12.5 L (4.12%)Rejected-Finance | ₹3.1 Cr+₹12.5 L (4.12%) | L-2 | Rejected-Finance L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹7.6 L
Closing Date
26 Dec 2023, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of S.E. B.S.C.C.C.-2, Mzp
Construction of Retaining wall from Km. 27.900 to 27.9394 of B.S.F.C.
2023_UPIDC_865099_21
08/SE/2023-24
Open Tender
Civil Works
Item Rate
180 days
Sidhi, M.P.
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹7.6 L
31 Jan 2024
20 Dec 2023
26 Dec 2023
20 Dec 2023
26 Dec 2023
20 Dec 2023
Amount
Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc. required for proper completion of work. (i) Soft rock/soil
(ii) Hard rock
Laying C.C. 1:3:6 (M–10) in foundation with cement coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&p etc. required for proper completion of work.
Centering and shuttering for R.C.C. work. Including all cost of labour charges, T&P etc. required for proper completion of work.in structure.
Centering and shuttering for enclose filter in side of retaining wall including all cost of labour charges, T&P etc. required for proper completion of work.
Providing M-15 (1:2:4) R.C.C in drain, chute and slipper with 4.75mm to 20mm size graded hard stone grit and coarse sand by Mechanical mixing with all materials, labour, T&P etc. required for proper completion of work.
Providing M-20 (1:1.5:3) R.C.C with 4.75mm to 20mm size graded hard stone grit and coarse sand by Mechanical mixing with all materials, labour, T&P etc. required for proper completion of work.
Cutting, Bending, Binding and placing of reinforcement. Including all cost of labour charges T&P etc. required for proper completion of work.
P.V.C. Pipe in weep hole 50 mm Ø. Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c
Laying and fixing joint filler board/coir soaked with bitumen in seal gap 18 mm thick. Including cutting, placing, all cost of material, labour charges T&P etc. required for proper completion of work.
Providing and laying coarse sand in filter including all cost of labour charges, T&P etc. required for proper completion of work.
Providing and laying graded filter stone grit 4.75mm to 20mm including cost of all materials, labour, T&P etc. required for proper completion of work.
Providing and laying graded filter stone ballast 20 mm to 40 mm including cost of all materials, labour, T&P etc. required for proper completion of work.
Earth work in filling good earth in R/S slope of canal section. including all cost of material labour charges T&P etc. required for proper completion of work.
Carriage and laying stone (weight not less than 40 Kg.) for pitching in R/S Slope of canal including all cost of material labour charges T&P etc. required for proper completion of work. average length of slope = 45.000 m.
M/S BHARAT SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .