Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance | ₹16.0 L | L1 | Accepted-Finance Techno-commercially accepted. |
| 2 | L2₹16.2 L+₹25,034.71 (1.57%)Rejected-Finance | ₹16.2 L+₹25,034.71 (1.57%) | L2 | Rejected-Finance Not L1. |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Scope of work does not include civil nature of job. |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Sphere of work is limited to Baliapur Block as mentioned in the uploaded document. |
Tender Value
₹14.8 L
Closing Date
6 Jul 2026, 5:00 pmClosed
GM Kusunda Area
Kusunda Area Office
Platform and Muck cleaning around 14 Weigh Bridges along with cleaning of Drains under Kusunda Area
2026_BCCL_361545_1
BCCL/KUS.A.6/CIV.ENGG/ eNIT/26-27/11
Open Tender
Civil Works - Others
Percentage
180 days
Kusunda Area
Please refer Tender documents.
4 documents required · 4 mandatory
Exempted
26 Aug 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
6 Jul 2026
1 Jul 2026
1 Jul 2026 - 3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Platform and Muck cleaning around 14 Weigh Bridges along with cleaning of Drains under Kusunda Area. | |||||
| 1.01 | Supply of Unskilled and Semiskilled labour as and when required as per EIC (for non rainy season) | 84 | Shift | 3,130.24 | ₹2,62,940.16 |
| 1.02 | Supply of Unskilled and Semiskilled labour as and when required as per EIC (for rainy season) | 210 | Shift | 3,756.29 | ₹7,88,820.9 |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 840.1 | M3 | 214.15 | ₹1,79,907.42 |
| 1.04 | Cleaning Drain, Garbage and Septic tank cleaning | 30 | M3 | 356.87 | ₹10,706.1 |
| 1.05 | Carriage of Mannure and Sludge ( 2km Lead) | 30 | M3 | 186.02 | ₹5,580.6 |
| 1.06 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 360 | m2 | 10.5 | ₹3,780 |
| 1.07 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_374432.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_374432.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .