Tender Value
₹4.1 Cr
EMD Value
₹4.9 L
Closing Date
16 Jun 2026, 11:00 am
Er. Vivek Thakur EE
JSV Division Nagrota Bagwan
Constructionof LIS to GP Sihoond and Baldhar SH_ Construction of RCC Main Channel
2026_HPIPH_135484_1
EE_NBD_26/ 2740-90 dt.02.06.2026
Open Tender
Civil Works
730 days
Nagrota Bagwan
Please refer Tender documents.
11 documents required · 11 mandatory
₹7,000
EE JSV Nagrota Bagwan
₹4.9 L
2 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches (for pipes and pits) up to all depths and in all clasification of soil work such as pick Work, jumper work, chiselling or Wedging out of soft and hard rock where the blasting work is prohibited saturated soil including pumping or bailing out water in all lifts including trimming and dressng of sides, levelling of beds to correct grade including shoring strutting planking timbering and dewatering where ever required. Stacking usable and unusable matrial/soil separetaly and after laying, jointing and testing of pipes (for pipes, pipe duct, chambers, x-signs etc.) returning the usable soil in 15 cm layers by ramming and wetering and then desposing of all surlus excavated soil/un usable material as directed wirhin all leads/lifts includng restoration of unmetalled surfaces to its original conditionn and includng cost of divresion for traffic, night signal boards, fixing custion boards, crossing over tranches for access to houses, fencing etc. complete in all respect as per the direction and to be entire of Engineer-in-Charge within all leads and lifts. (Pick work & jumper work) | 3,131.03 | Cum | - | - |
| 2 | Dressing of bed and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 5,925.5 | Sqm | - | - |
| 3 | Dressing of side slopes verrtical and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 10,742 | Sqm | - | - |
| 4 | Providing and Laying cement concrete 1:4:8 (1cement:4 sand:8 graded stone aggregate 40mm nominal size) and curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 597.27 | Cum | - | - |
| 5Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 225.6 | Sqm | - | - |
| 5.02 | Form work for duct linning kuhl:- Vertical surfaces such as walls of ducts (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 17,602.5 | Sqm | - | - |
| 6 | Providing and laying cement concrete work 1:3:6 (1cement:3 sand: 6graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work concrete work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to be entire satisfection of Engineer-In-Charge. | 1 | Cum | - | - |
| 7Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 7.01 | Foundations, footings bases of columns and the like and mass concrete complete in all respect as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 729.76 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Termsandconditions.pdf
Tender Documents • 0.21 MB
Form6.pdf
Tender Documents • 0.29 MB
BOQ_200659.xls
BOQ • 0.29 MB
Form8.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid