| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.5 LAccepted-AOC | ₹11.5 L | 1 | Accepted-AOC lowest tenderer |
| 2 | 2₹16.9 L+₹5.3 L (46.3%)Rejected-AOC | ₹16.9 L+₹5.3 L (46.3%) | 2 | Rejected-AOC 2nd lowest tenderer |
Tender Value
₹12.7 L
EMD Value
₹31,651
Closing Date
21 Aug 2020, 2:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, PWD BRIDGES DIV, TVM
site survey, soil investigation etc
2020_PWD_376291_1
PWD/2020-2021/14825/BDnT
Open Tender
Civil Works - Bridges
Item Rate
90 days
Akkulam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹31,651
Yes
23 Nov 2020
12 Aug 2020
24 Aug 2020
12 Aug 2020
21 Aug 2020
12 Aug 2020
Amount
Appendix-A
56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.
od21203/2019_2020 : Conducting Traffic Survey by setting up 2 stations on either side of road at a time at a location including shed, furniture, labour charges of survey assistants, cost of stationaries etc.(on both sides) complete.
od5246/2020_2021 : Collection of soil sample from subgrade for soil classification tests , standard proctor test and CBR test - Collection of subgrade soil samples at one location as suggested by the Engineer -in-charge - carefully by excavating pit of area 1mx0.6m from subgrade of formation area (30cm below original shoulder level) as directed by the engineer in charge for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site
od5231/2020_2021 : Conducting soil classification tests ,standard proctor test and CBR test as per the Indian Standard Code specifications. Conducting the test as per IS code guidelines and preparing result of soil sample
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.3.d.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7 : Conducting standard penetration test in bore hole at any depth.Conducting standard penetration test in bore hole at any depth.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.11.c : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)<br>Additional set for machine boring(extra for bore holes exceeding 5 nos)Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab tests (report in triplicate)Additional set for machine boring(extra for bore holes exceeding 5 nos)
od18641/2019_2020 : Preparation of detailed project report for the proposed Flyover for submitting to Government (8 set)
BJDS INFRASTRUCTURES AND PROJECTS PRIVATE LIMITED
Bidder Name
MUHAMMAD NIYAS
BJDS INFRASTRUCTURES AND PROJECTS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_533264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .