Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.9 LAccepted-AOC 402 BESTECH CHAMBER B BLOCK SUSHANT LOK PHASE I GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹20.8 L+₹6.9 L (50.0%)Rejected-Finance | L-2 | Rejected-Finance As per approval of Competent Authority | |
| 3 | L-3₹21.7 L+₹7.8 L (56.2%)Rejected-Finance D 36 SECTOR 6 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L-3 | Rejected-Finance As per approval of Competent Authority | |
| 4 | Rejected-Technical | - | Rejected-Technical As per approval of competent authority |
Tender Value
Refer Docs
EMD Value
₹76,000
Closing Date
7 Oct 2020, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. General Manager (PnC)
Parbati HE Project, Stage-II, Parbati Complex, Nagwain,Distt.-Mandi (H.P.)-175121
Hiring of Environmental Consultant for carrying out EIA-EMP studies in respect of Dugar HE Project (449 MW)(Package No. DHEP-01)
2020_NHPC_582403_1
NH/PP-II/PnC/Pkg No. DHEP-01/2020
Open Tender
Miscellaneous Services
Works
540 days
Dugar HEP, Killar, Chamba (H.P.)
As per Tender Document
7 documents required · 7 mandatory
₹590
Yes
NHPC Limited
₹76,000
Yes
4 Jan 2021
9 Sept 2020
13 Oct 2020
9 Sept 2020
7 Oct 2020
9 Sept 2020
120 days
Amount
Hiring of Environmental Consultant for carrying out EIA/EMP studies in respect of Dugar HE Project (449 MW)
To carry out Environmental Impact Assessment studies and formulation of Environmental Management Plans (EIA & EMP) & reports thereof and any other reports / observation (s) desired by EAC for grant of Environment Clearance as per EIA Notification 2006 and subsequent amendments, along with the approved Terms of Reference issued by the MoEF& CC as mentioned in the Tender Documents; presentations before EAC and during public consultation process. This shall include any additional study (ies) / condition(s) imposed during the EC process by MoEF&CC and observations thereof. (Note:-The bidder should include all expenditure towards transportation of equipment, movement to and from sites, installation / erection, if any insurance all applicable taxes, watch & ward at site, schedule of field work, report submission etc required till completion of the study and submission of final report to MOEF & CC.)
WAPCO Ltd.
MANTEC CONSULTANTS PVT. LTD.
stage.html
html • 0.05 MB
technical_611895.pdf
PDF • 0.19 MB
techsummary_611895.pdf
PDF • 0.55 MB
finance_611895.pdf
PDF • 0.51 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_611895.pdf
PDF • 0.63 MB
LOADHEP1.pdf
PDF • 5.12 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .