Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs/replacement to 100KVA HT/LT substation (33/0.44KV) at Lift Irrigation Scheme Saifkhul.
2023_IFC_218493_15
eNIT 06 of 2023-24
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Sopore
Please refer Tender documents.
6 documents required · 6 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
₹1,084
Yes
6 Jul 2023
24 Jun 2023
4 Jul 2023
24 Jun 2023
3 Jul 2023
24 Jun 2023
Amount
Repairs to 100KVA HT/LT Transformer with respect following works (33/0.44 KV) Disconnecting from active (33/0.44 KV) circuit, transportation of damaged transformers from lift irrigation scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up . Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to 33000 HT circuit, testing on no load and then on full load.
Manufacturing/ Providing / Fitting of 33 KVA HT coils manufactured out of super enameled Copper wire of standard guage and size. weight of each coil is approx. 3kg (Total coils 06 No’s)
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / Fitting of SRBP Tube
Providing and filling of fresh T. oil of standard grade.
Filtration of old existing transformer oil for removing moisture and carbon content to achieve the BDV value of oil and dehydrating of old coils along with cradle in oven/heating room to remove moisture.
Providing and fitting of L.T bush rods of required size heavy duty after removing and extraction of old damaged ones. The job includes connecting with connections and taping complete.
Providing and fitting of 33kVA drop out fuse set polymer type heavy duty complete with all nut bolts and welding of existing channels wherever necessary after removing and extraction of old damaged drop out.
80 % Cost of scrap windings (copper) to be retained by the contracting agency.as per actual weight of scrap.
City Engineering Works
M/s SAJID ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .