| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.0 LAccepted-AOC | ₹55.0 L Quoted ₹55.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹56.9 L+₹1.5 L (2.75%)Rejected-AOC | ₹56.9 L+₹1.5 L (2.75%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MUHAMMED BASHEER L1 | SANEESH MOHANAN L2 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 78.75 | sqm | 420.92 ₹33,147.45 Lowest | 432.5 ₹34,059.38 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 20.45 | sqm | 1,047.76 ₹21,427.74 Lowest | 1,076.59 ₹22,017.34 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 22.7 | sqm | 831.54 ₹18,874.29 Lowest | 854.43 ₹19,393.85 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 13.77 | sqm | 1,099.32 ₹15,140.93 Lowest | 1,129.58 ₹15,557.71 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15 | cum | 11,432.76 ₹1,71,514.27 Lowest | 11,747.42 ₹1,76,234.79 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,720.4 | kilogram | 122.55 ₹2,10,835.02 Lowest | 125.92 ₹2,16,632.77 |
| 1.01 | OD30540/2022-2023:Conveying, lifting, handiling, hoisting, aligning and fixing R.C.C 300 mm square, 6 m in
length from the place of casting to placing site driving plant up to a distance of 150 m including hire charges
for planks, wooden scantiling, coire rope,crow bars, etc. complete | 89 | metre | 1,255.63 ₹1,11,751.07 Lowest | 1,290.18 ₹1,14,826.02 |
| 1.01 | OD30541/2022-2023:Driving down RCC piles 300 to 400mm square 6m to 12m in length to lines and levels
through various strata from bed level till refusal with monkey weighing not less than 2 T with the aid of pile
Driving plant with winch barg and accessories, wire rope manila rope etc for including labor and hire
charges for all machinery and material required and cost of lubricant oils pay of staff etc complete (Details
for two piles(6m to 12m)length ) | 60 | metre | 693.09 ₹41,585.4 Lowest | 712.16 ₹42,729.6 |
| 1.01 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 9.75 | cum | 4,002.36 ₹39,023.01 Lowest | 4,112.52 ₹40,097.07 |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
17 Feb 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer Irrigation Division Alappuzha
GENERAL Boat jetty Construction of boat jetty and side protection of Kayamkulam kayal in Vettathu kadavu jetty in Arattupuzha Panchayath in Harippad LAC General Civil Work
2026_Irrig_825990_2
IRR/IA/TR/1396/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Arattupuzha
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
8 Jun 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.002 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | sqm | - | - |
| 1.005 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | OD30540/2022-2023:Conveying, lifting, handiling, hoisting, aligning and fixing R.C.C 300 mm square, 6 m in
length from the place of casting to placing site driving plant up to a distance of 150 m including hire charges
for planks, wooden scantiling, coire rope,crow bars, etc. complete | - | metre | - | - |
| 1.008 | OD30541/2022-2023:Driving down RCC piles 300 to 400mm square 6m to 12m in length to lines and levels
through various strata from bed level till refusal with monkey weighing not less than 2 T with the aid of pile
Driving plant with winch barg and accessories, wire rope manila rope etc for including labor and hire
charges for all machinery and material required and cost of lubricant oils pay of staff etc complete (Details
for two piles(6m to 12m)length ) | - | metre | - | - |
| 1.009 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1403204.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
niiiiiiiit.pdf
Tender Documents • 0.03 MB
sbbbbbbbbbd.pdf
Tender Documents • 2.73 MB
BOQ_1403204.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .