Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.1 LAccepted-Finance | L-1 | Accepted-Finance Being 1st lowest | |
| 2 | L-2₹8.1 L+₹7,101.10 (0.88%)Rejected-Finance | L-2 | Rejected-Finance Being 2nd lowest | |
| 3 | L-3₹8.6 L+₹57,672.45 (7.15%)Rejected-Finance | L-3 | Rejected-Finance Being 3rd lowest | |
| 4 | L-4₹8.9 L+₹86,268.78 (10.7%)Rejected-Finance HIMACHAL PRADESH | L-4 | Rejected-Finance Being 4th lowest |
Tender Value
₹9.6 L
EMD Value
₹19,200
Closing Date
27 Jan 2026, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Seraj
HPPWD Division Seraj at Janjehli
Construction of Stage at Govt Sr Sec School Parwara Tehsil Chachiot Distt Mandi HP SH C o Building Portion
2026_PWD_126153_1
9141-43 dt. 14.01.2026
Open Tender
Civil Works - Roads
Percentage
Janjehli
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
₹19,200
2 Feb 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
Excavation work by mechanical means (Hydraulic excavator)/ manual means infoundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including gettingout the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.All kinds of soil.including carriage of material within all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (one cement : five fine sand : ten graded stone aggregate 40 mm nominal size) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form for all heights Foundations, footings, bases of columns, etc. for mass concrete including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form for all heights; Lintels, beams, plinth beams, girders, bressumers and cantilevers including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (one cement : one point five coarse sand: three graded stone aggregate 20 mm nominal size) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
SR masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (one cement : six coarse sand : twelve graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (one cement : six coarsesand) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Stone soling properly handpacked filling interstices with Khranja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm (one hundred milimeter ) spread thickness (finished work including materials and labour) and to the entire satisfaction and direction of Engineer-in-Charge including hauling/carrige of materials to various location through all modes of transportion in all leads, lifts and other incidental complete in all respect including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - : 1:2:4 (one cement : two coarse sand : four graded stone aggregate 20 mm nominal size) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (one cement : four coarse sand) :25 mm thick with 10 cm wide granite band including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (one cement : six coarse sand) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Providing and fixing 0.47mm thick prepainted insulated steel sheet sand-wich puf roofing, with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primer coating,the thickness of puff should not be less than 5 mm and wt.of puff shoud be 35-37 kg per cu.m. i/c fixing with self drilling and self tapping fasten of size 5.5 mm dia and 55 mm lap complete with all accesoriees as required as per the direction of Engineer-in-charge.
Providing and fixing ridges or hips 60 cm overall with 0.60mm thick prepainted steel sheets in roofing with hot dipped metalic zinc coated sheets with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with self drilling and self tapping fasten of size 5.5 mm dia and 55 mm lap complete with all accessories as required as per the direction of Engineer in Charges.
Providing and fixing valley 90 cm overall 0.62mm thick prepainted steel sheet in roofing with hot dipped metalic zinc coated sheet with top coat of regular modified polyster organic coating of 20 microns over 5 microns primer coating back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with self drilling and self tapping fasten of size 5.5 mm dia and 55 mm lap complete with all accessories as required as per the direction of Engineer-in-charge.
Providing and fixing M.S. BP Sheet 1.66mm to 2.00 mm thick in eaves board/ facia/soffit / ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-charge (Base members of steel work shall be measured & paid separtely) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
15 mm (fifteen millimetre) cement plaster on rough side of single or half brick wall of mix 1:6 (one cement: six coarse sand) including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives. New work (Two or more coats applied @ 1.43 litre/ 10 Per Square Meter Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick Cement fiber board as per IS: 14862 including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture including carriage of materialwithin all leads and lifts and other incidental and as per the direction of the Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
1.pdf
Tender Documents • 3.53 MB
BOQ_185938.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .