Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹37.3 L+₹4.2 L (12.6%)Rejected-AOC VELAYARTHOTTIYIL HOUSE VEMPALLY P O 686633 | VEMPALLY | KOTTAYAM | KERALA | 686633 | L2 | Rejected-AOC Being L2 |
Tender Value
₹34.0 L
EMD Value
₹50,000
Closing Date
13 Jun 2025, 1:00 pmClosed
Executive Engineer
Executive Engineer PWD Roads Maintenance Division Kottayam
supply and filling with 36mm for large potholes tack coat.CGPS clearing vegetation clearing and grubbing. 12mm supply and pot hole filling.man mazdoor, excavator, tipper. M40 interlock paving with GSB8. 1 3 6 concrete M20 Concrete irish drain.SHE
2025_PWD_762669_2
PWD/RM/3/581/2025-26
Open Tender
Civil Works - Roads
Item Rate
365 days
Kaduthuruthy
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,760
Yes
₹50,000
Yes
23 Jul 2025
5 Jun 2025
16 Jun 2025
5 Jun 2025
13 Jun 2025
5 Jun 2025
Amount
Part A Reactive Maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD223618/2024-2025:MORD - Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) OR 13.2mm to 0.9 mm (Type - B) aggregates using penetration grade bitumen using VG 30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheeled roller 8-10 KN static roller and finishing to required level and grade as per Technical specification clause 509 of MORD - Bitumen @22 kg / 10 m2....
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
OD223619/2024-2025:providing and fixing vinyl sticker including lettering symbols for existing DLP board 1.22m*0.61m size including painting all exposed surface with one coat of epoxy painting etc. complete
Part B Proactive Maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
OD225533/2024-2025:OD218674/2024-2025 Filling up potholes with bituminous ready mix compound (25kg bag) and compacting by ramming to get a compact surface including of cost of material,laying charges, transportation
Part C Premonsoon work
OD223623/2024-2025:engaging man mazdoor for cleaning drain and culvert, diverting drains, cleaning sighboards , shifting and placing cover slabs and other various works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD2173/2025-2026:Engaging wood cutters with machine for cutting trees and removal of fell down trees and branches and removal of stumps roots etc complete
OD223620/2024-2025:Hire and running charges of Tipper 5.5 cum capacity for conveying the silt removed
OD223621/2024-2025:Engaging hydraulic excavator for removing deposited materials during monsoon season in road way and other emergency nature works for restore traffic
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
Part D Routine Inspection
OD223616/2024-2025:Engaging labour with passenger car not less than1000cc for conducting and reporting routine inspection per km for the entire length of project road at a frequency of 7 days through out the agreement period of running contract as directed by the department officers.
Sunny V D (BID ID -2222440)
Bidder Name
Sunny V D
C A MAKKAR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1252594.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .