Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹892.59 (0.52%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.8 L+₹13,497.14 (7.93%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.9 L+₹18,122.42 (10.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.0 L+₹25,966.45 (15.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
11 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Construction of Culvert near Tasleem Arif Dar Ward No.11 at Gangerhama Ganderbal.
2026_PWDJK_319696_3
NIT No.48-2026-27
Open Tender
Civil Works
Percentage
25 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Ganderbal
₹5,400
18 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 6.21 | Cum | 256.85 | ₹1,595.04 |
| 2 | P/L, of dry stone soling duly hand packed with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete | 0.62 | Cum | 950 | ₹589 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) all complete. | 0.41 | Cum | 5,202.9 | ₹2,133.19 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) all complete. | 2.19 | Cum | 7,788.4 | ₹17,056.6 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) all complete. | 4.53 | Cum | 9,821.85 | ₹44,492.98 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.including all carriage involved complete. | 739.2 | Kgs | 123.2 | ₹91,069.44 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) complete. | 6.21 | Cum | 8,422.45 | ₹52,303.41 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 5.04 | Sqm | 286.35 | ₹1,443.2 |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 14.09 | Sqm | 718.2 | ₹10,119.44 |
| 8.02 | Centering and shuttering including strutting, propping etc. and removal of form work for: Edges of slabs and breaks in floors and walls Above 20 cm wide all complete. | 4.03 | Sqm | 1,145.1 | ₹4,614.75 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1059858.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .