Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
| 4 | Accepted-Technical 108 3 CHANDAR NAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Accepted-Technical ok |
| 5 | Accepted-Technical PLOT NO B1 INFOCITY 122004 | REWARI | REWARI | HARYANA | 122004 | Accepted-Technical ok |
Tender Value
Refer Docs
EMD Value
₹1.9 Cr
Closing Date
23 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER (P)SR-II,
EXECUTIVE ENGINEER (P)SR-II, ROOM NO.307, VARUNALYA PHASE-I, JHANDEWALAN KAROL BAGH-110005
NIT No.5 /EE (P) SR.II/ (2025-26)
2025_DJB_276905_1
NIT No.5 /EE (P) SR.II/ (2025-26)
Open Tender
Composite Works
Works
5475 days
EXECUTIVE ENGINEER (P)SR-II
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,500
DJB EMD A/c No. 50448339804 at Indian Bank,
₹1.9 Cr
Office of Chief Engineer (DR)-PROJECTS-I,
15 Jan 2026
15 Aug 2025
23 Oct 2025
15 Aug 2025
23 Oct 2025
25 Aug 2025
22 Aug 2025
A) Design and Build Contract of various units for following:
A-1 Design engineering and submission of drawing for all the units (Payable as per Price schedule A1)
A-2 Capital cost for Kakrola, 1. Sewage Pumping Station 2. Sewage treatment Plant (5.5 MGD) 3. Disposal Main up to Disposal point, Including pumping station, if any
A-3 Capital cost for Dichaon 1. Sewage Pumping Station 2. Sewage treatment Plant (5.5 MGD) 3. Disposal Main up to Disposal point, Including pumping station, if any
A-4 Capital cost for Kair 1. Sewage Pumping Station 2. Sewage treatment Plant ( 1 MGD) 3. Disposal Main up to Disposal point, Including pumping station, if any
A-5 Capital cost for Kanganheri 1. Sewage Pumping Station 2. Sewage treatment Plant (2 MGD) Disposal Main up to Disposal point, Including pumping station, if any
B) Operation and maintenance Cost
B-1 All in all Operation and Maintenance cost for 15 years at Kakrola DSTP {As per Table 4}
B-2 All in all Operation and Maintenance cost for 15 years at Dichaon DSTP {As per Table 4}
B-3 All in all Operation and Maintenance cost for 15 years at Kair DSTP {As per Table 4)}
B-4 All in all Operation and Maintenance cost for 15 years at Kanganheri DSTP {As per Table 4)}
C) Electricity Cost
C-1 Electricity Consumption for 15 Year (Kwh/Year) for Kakrola (Payable as per Table 8 )
C-2 Electricity Consumption for 15 Year (Kwh/Year) for Dichaon (Payable as per Table 8 )
C-3 Electricity Consumption for 15 Year (Kwh/Year) for Kair (Payable as per Table 8)
C-4 Electricity Consumption for 15 Year (Kwh/Year) for Kanganheri (Payable as per Table 8)
stage.html
html • 0.03 MB
techsummary_365275.pdf
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Volume_II.pdf
Tender Documents • 1.10 MB
Volume_VIII_Drawings.pdf
Tender Documents • 14.27 MB
Volume_III.pdf
Tender Documents • 1.16 MB
BOQ_365275.xls
BOQ • 0.35 MB
Volume_IV.pdf
Tender Documents • 2.43 MB
Volume_V.pdf
Tender Documents • 0.98 MB
Volume_VI.pdf
Tender Documents • 0.83 MB
Volume_VII.pdf
Additional Documents • 1.15 MB
Volume_I.pdf
Tender Documents • 1.87 MB
Corri4.pdf
PDF • 2.53 MB
Corri3.pdf
PDF • 0.96 MB
Corri2-NIT5.pdf
PDF • 0.28 MB
Corri1_NIT5.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .