Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | L1 | Admitted-Finance | |
| 2 | L2₹4.6 L+₹17,578 (3.97%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.0 L+₹57,197.45 (12.9%)Admitted-Finance V P O DARINI TEHSIL SHAHPUR HIMACHAL PRADESH 176206 | DARINI | KANGRA | HIMACHAL PRADESH | 176206 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AKSHAY KUMAR L3 | Daljeet Singh L1 | Shivansh Sharma L2 |
|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge Soft rock | 19.97 | cum. | 150 ₹2,995.5 Lowest | 250 ₹4,992.5 | 300 ₹5,991 |
| 2.01 | Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required. 20% upto | 6.4 | cum. | 150 ₹960 Lowest | 650 ₹4,160 | 200 ₹1,280 |
| 3.01 | Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 wqm on plan), including dressing of sides and ramming of bottoms, lift upt 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed by the engineer in charge within a lead of 50 m | 36 | Cum. | 150 ₹5,400 Lowest | 250 ₹9,000 | 250 ₹9,000 |
| 4.01 | Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8graded stone aggregate 40mm nominal size) and curing etc. complete. In foundation & Plinth. | 3.01 | Cum. | 4,100 ₹12,341 Lowest | 4,300 ₹12,943 | 4,800 ₹14,448 |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of same form work for wall, R/wall returns/wall of any fillets steps etc. | 171.48 | Sqm. | 190 ₹32,581.2 Lowest | 250 ₹42,870 | 200 ₹34,296 |
| 6.01 | Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete upto plinth level | 7.35 | cum. | 5,400 ₹39,690 | 4,800 ₹35,280 Lowest | 5,500 ₹40,425 |
| 7.01 | above plinth level | 22.09 | cum. | 5,400 ₹1,19,286 | 4,800 ₹1,06,032 Lowest | 5,500 ₹1,21,495 |
| 8.01 | Providing and laying cement concrete 1:1.5:3 (1 cement 1.5 sand : 3 graded stone aggregate 20 mm nominal size) walls (any thickness) including attached pilastes, columns, piers, abutments, pollars, posts, struts, buttresses, string or lacing courses, parapets, copinged blocks, anchor blcks, plain window sills, fillets, sunken floor etc.m up to floor five level, excluding the cost of centerting , shuttering and finishing | 12.3 | cum. | 5,500 ₹67,650 | 5,400 ₹66,420 Lowest | 7,100 ₹87,330 |
| 9.01 | Providing mild/ for steel reinforcurment tor reinforced cement concrete work i/c bending, binding and placing in position complete i/c the cost of binding wire etc. | 1,107 | kgs | 78 ₹86,346 | 75 ₹83,025 Lowest | 75 ₹83,025 Lowest |
| 10.01 | Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement:3 fine sand) | 132.05 | Sqm. | 200 ₹26,410 Lowest | 200 ₹26,410 Lowest | 200 ₹26,410 Lowest |
Tender Value
₹8.4 L
EMD Value
₹15,000
Closing Date
11 Sept 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DISTT. PROJECT OFFICER, IDP, BILASPUR
DISTT. PROJECT OFFICER, IDP, BILASPUR
PR-129/2025-26 Construction of Sub Surface Dykes( Makowal ) at place vill. Tarelu (near land of Sh. Ram Partap ) in GP Balseena under APO Berthin
2025_CPD1_113510_1
506159-CW-RFQ
Open Tender
Civil Works
Item Wise
45 days
DISTT. PROJECT OFFICER, IDP
Total Monetaryvalue and list of works of last three years, financial statement, Certificate of movable and fixed assets valuation, Copy of PAN, Bank Account Copy of GST,GST Clearance Copy of SignedscannedLetterofQuotationforTechnical andfinancial par
7 documents required · 7 mandatory
₹500
DISTT. PROJECT OFFICER, IDP, BILASPUR
₹15,000
12 Sept 2025
1 Sept 2025
12 Sept 2025
1 Sept 2025
11 Sept 2025
1 Sept 2025
1 Sept 2025 - 11 Sept 2025
Amount
Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by engineer-in-charge Soft rock
Extra rates for quantities of works, executed in or under water and/or liquid mud, including pumping out water as required. 20% upto
Earth work in excavation by Mechanical means Hydraulic exavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 wqm on plan), including dressing of sides and ramming of bottoms, lift upt 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed by the engineer in charge within a lead of 50 m
Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8graded stone aggregate 40mm nominal size) and curing etc. complete. In foundation & Plinth.
Centering and shuttering including strutting, propping etc. and removal of same form work for wall, R/wall returns/wall of any fillets steps etc.
Providing and laying cement concrete 1:3:6 ( 1 cement: 3 sand: 6 graded stone aggregate 20mm nominal size) and curing complete upto plinth level
above plinth level
Providing and laying cement concrete 1:1.5:3 (1 cement 1.5 sand : 3 graded stone aggregate 20 mm nominal size) walls (any thickness) including attached pilastes, columns, piers, abutments, pollars, posts, struts, buttresses, string or lacing courses, parapets, copinged blocks, anchor blcks, plain window sills, fillets, sunken floor etc.m up to floor five level, excluding the cost of centerting , shuttering and finishing
Providing mild/ for steel reinforcurment tor reinforced cement concrete work i/c bending, binding and placing in position complete i/c the cost of binding wire etc.
Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement:3 fine sand)
White washing with lime to give an even shade
Supplying and stacking at site 63 mm to 45 mm size stone aggregate & 53 mm to 22.4 mm size stone aggregate
Providing and fixing of GI Pipe 25 mm dia
Providing and fixing GM gate valve 25mm size
50 mm size
Providing and fixing HDPE pipe 40 mm & for weep holes
Providing and fixing plastic net jali
Providing and fixing HDPE pipe32mm
Providing and writting.name plate
Shivansh Sharma (BID ID -554656)
AKSHAY KUMAR (BID ID -554740)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .