| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 L+₹2.1 L (78.3%)Rejected-AOC | ₹4.8 L+₹2.1 L (78.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.8 L+₹4.1 L (151.1%)Rejected-AOC | ₹6.8 L+₹4.1 L (151.1%) | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
10 May 2022, 3:00 pmClosed
Varghese P O
SM P AND P FACT LTD
Fabrication and Erection of RC Conveyor-A vent line, Patch / Repair / modification works on Dryer A and B, RC Elevator A and B and other elevator / conveyors casing / shell, etc. in NP Plant during ATA-2022.
2022_FACT_685429_1
04096/2022-2023/E25324
Limited
Miscellaneous Works
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105B )
4 documents required · 4 mandatory
₹0
₹5,000
Yes
16 May 2022
25 Apr 2022
11 May 2022
25 Apr 2022
10 May 2022
25 Apr 2022
Fabrication and Erection of RC Conveyor-A vent line, Patch / Repair / modification works on Dryer A and B, RC Elevator A and B and other elevator / conveyors casing / shell, etc. in NP Plant during ATA-2022.
Fabrication and Erection of Recycle conveyor-A vent line at NP Plant. Work Involves: The required materials, pipes, bolts, tools and tackles for the fabrication of pipes and bends shall be transported to fabrication yard / site. The pipes and mitered bends shall be fabricated according to suit with site condition and as per the instruction of Engineer-in-charge. Flange joints shall be welded properly at inside and outside (flange joint should be consider as a single joint). Marking, cutting, Edge preparation with single bevel, proper grinding and welding shall be carried out as per the instructions. Size of pipes and fittings are 300NB. The required length of pipes and fitting [from 0.5 m to 7 mtrs] shall be taken from the store and transported to fabrication yard / site as per the instructions of Engineer - in – Charge. Fabrication and erection shall be done as per the drawing no. TS/M/SK 843. Necessary / required scaffolding shall be arranged at site for proper / convenient erection and hook up of complete pipe. The vent pipe line shall be lifted / positioned / aligned and to be connected / jointed by flange/welding. If require temporary support shall be given to the vent line. The alignment, level, verticality etc. shall be corrected perfectly. One end of the vent line is RC Conveyor- A top surface and other end is product cooler vent line. The end welding of Vent line pipe shall be done as per the instruction of the Engineer-in-charge. During erection of vent line if any structural obstacle, shall be removed without any extra cost. while All the flange joints shall be tightened properly and put the vent line in service without any leak. The flange joints shall be tightened with required gasket / slip plate. If any correction / rework are required to be done during erection and it shall be arranged at site by the contractor without any extra cost. Spool piece shall be provided approximately 1 m length as per the drawing no. TS/M/SK 843. The structural steel after transporting from store to worksite shall be immediately be cleaned and first coat primer shall be applied. The structurals after fabrication and erection shall be applied with second coat of zinc chromate yellow primer after necessary cleaning at all heights and elevations .Two coats of synthetic enamel paint of distinct colours shall be applied one after the other after giving sufficient curing time after each coat applied at all elevations. Any area inaccessible after erection shall be painted beforehand. All costs incurred in painting including cost of paints, primers, painting equipments, cleaning equipments, handling charges, scaffolding and any other incidental expenses will be under contractor's scope.
Patch / Repair / modification works on RC Elevator A & B and other elevator / conveyors casing / shell, etc. with MS plate. Work involves: Collection and transportation of MS Plates [6mm to 12mm thk.] and required materials from CD - stores. Patch / repair / modification works particularly on RC Elevator A & B and other elevator / conveyors casing / shell, etc. shall be done properly to meet the site requirement. Cutting, shaping / bending and fixing of new plates shall be done after the removal of existing damaged MS plates. Proper welding and grinding shall be done as per the instruction of Engineer incharge to suit with the site condition.
BABY B
HASSAN MM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_721318.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .