| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC Committee approved L1 | |
| 2 | L2₹7.2 L+₹6,730 (0.94%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.3 L+₹15,150 (2.12%)Rejected-AOC MOHALLA DESHNAGAR PILIBHIT | PILIBHIT | PILIBHIT | UTTAR PRADESH | L3 | Rejected-AOC L3 |
Tender Value
₹7.2 L
EMD Value
₹7,150
Closing Date
9 Jul 2024, 5:00 pmClosed
SE EUDC
35-B RAMPUR GARDEN BAREILLY
ELECTRICAL WORK DEPOSIT UNDER EUDD-I BAREILLY
2024_MVVNL_927546_2
T-23/EUDCB/2024-25
Open Tender
Electrical Works
Item Rate
45 days
EE EUDD-I BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹7,150
24 Oct 2024
1 Jul 2024
10 Jul 2024
1 Jul 2024
9 Jul 2024
1 Jul 2024
Amount
For the work of giving of New 121 K.W/134 KVA multipoint Connection to for Electrification of new Colony “THE YARD” at Site Station road opposite Aabkaari Vibhag ,Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
New 250 KVA T/F
LT XLPE Cable (3.5x240 sqmm)
LT XLPE Cable (1.0x240 sqmm)
11 KV XLPE Cable (3x70 sqmm)
11 KV Cable Jointing Kits (3X70 sqmm) O/D
Other Line materails
Erection Work
Erection of RS.Joist 04 Pole Structure ( 100 MMX116 MMX11 MM) ( All Associated along with 04 No. RS. Joist Pole Shall be Contractor).
Under Ground Laying of LT XLPE Cable (3.5x240 sqmm) by HDD Method .
Overhead Laying of 11 KV XLPE Cable (3x70 sqmm)
Laying of LT XLPE Cable (1.0x240 sqmm).
Mounting of 250 KVA T/F on Newly errected 04 Pole Structure .
Earthing of 250 KVA T/F water level body & neutral, with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Chemical Erathing for LT Pannel & Meter Pannel.
The work of fabrication /construction and grouting of new wire mesh fencing of 12 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 40x40x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor).
Supply & Fixing of Following Items
Supply & Fixing of LT Pannel with 450 Amp. MCCB as per incomer & 200 Amp. MCCB 02 No. Outgoing of rmetering Pannel for 250 KVA T/F
Supply & Fixing of meter panel with 12 nos. meter space & outgoing MCCB 63 Amp. 04 Pole & Busbar Complete .
AL. Lugs (240 sqmm)
For the work of shiting of 11 KV Pole on request of Shri Rahunandan Singh Yadav, at Site South City Budaun Road, Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
ST Pole 11 Mtr. long
Other Line materails
Erection Work
Dismentling of Existing ST Pole with all accessories and erection of new ST Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Erathing of Pole
Fixing of associated Items i.e. T-off Channel-02 No., 11 KV Pin Insulator with Pin-03 No.
Supply & Fixing of Following Items
F-Calmps with nut & bolts .
Holding Clapms for T-OFF
Back Carriege of Scap materails from Site to C.B Ganj, Central Store Bareilly including loading & Unloading.
For the work of shiting of 11 KV Pole on request of Shri Ajay Chouhan at site Ganesh Nagar , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
ST Pole 11 Mtr. long
ACSR Weasal Condcutor
Dismentling of Existing ST Pole with all accessories and erection of new ST Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of ACSR Weasal Conductor
For the work of shiting of LT Pole on request of Mohd. Yasir at site Roadways Bus stand ke peeche ,College road , Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.y.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
ST Pole (9.00Meter Long)
Erection Work
Dismentling of Existing ST Pole with all accessories and erection of new ST Pole including digging of pit & grouting work complete and fitting of all accessories complete.
For the work of giving 02 KW (LMV-I) Connection to Smt. Preeti Singh , By extension of LT Line at Pragati Nagar Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
PCC Pole (8.5 Meter Long)
AB Cable (3X50 sqmm)
Erection Work
Erection of new PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of AB Cable 3x50 sqmm
Supply & Fixing of Following Items
Stone Pad
LT Clamp with I hook
For the work of giving 02 KW (LMV-I) Connection to Rakesh S/O Sri lt Budhsen, By extension of LT Line at Site city enclave badaun Road Bareilly under Full deposited fund-2024-25 under EUDD-I, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading
PCC Pole 8.5 Mtr Long
AB Cable 3x50 sqmm
Distribution Box 3 phase
Stay set complete
Erection Work
Erection of new PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete
Laying of AB Cable 3x50 sqmm
Earthing of Pole
Erection and fixing of stay set complete
Erection and fixing of LT Distribution Box
Supply & Fixing of Following Items
LT Shackle Insulator with clamp and nut bolts
Piercing Connector
M/S ZAHOOR TRADERS
POWER AND POWER CONSULTANTS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .