Loading…
Loading…
Tender Value
₹5.4 L
EMD Value
₹10,887
Closing Date
25 Jun 2026, 11:30 am2d left
Similar tender results from the same govt authority in the past 3 years.
EE MDD-II
Office of the Executive Engineer Metropolitan Drainage Division No.-II Jalasampad Bhavan(7th Floor), Bidhannagar, Kolkata- 700 091
Protection work for a length of 75.0 m along both bank of DD1 East branch channel in between 2050.00 m to 2550.00 m within Ward No. - 108 of KMC area, P.S. - Anandapur, Dist - Kolkata during year 2026-27. (2nd Call)
2026_IWD_1028469_1
WBIW/EE/MDD-II/e-NIT-09/ 2026-27
Open Tender
CIVIL WORKS
30 days
Ward No. - 108 of KMC area, P.S. - Anandapur
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,887
Yes
19 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
15 cm av. Diameter.
Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. | 1,125 | Mtr. | 258.62 | ₹2,90,947.5 | 1 |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
15 cm av. diameter
Note:
1) Payment to be made on the length driven into the ground. Diameter
to be measured at 1.5m. from the thicker end.
2) For string staging under specific instruction of Engineer-in-charge or
for driving from pontoon or boats, the rate will be enhanced by rs. 4.00 per meter. | 832.5 | Mtr. | 129.91 | ₹1,08,150.08 | 2 |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
Width of thinner end above 15 cm.
Jhaw / Eucalyptus. | 150 | Mtr. | 228.83 | ₹34,324.5 | 3 |
| 4 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge.
One Coat | 587.71 | Sqm | 34.56 | ₹20,311.26 | 4 |
| 5 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Beyond 3.00 km and upto 4.00 km
Note : For compensation for earth for land owned and arranged by Contractor add Rs. 25.00 per m3 extra over rate of E/W for land owned/ arranged by the Department. Royalty charge on earth @ Rs. 29.00 per m3 & Cesses charges @ Rs. 5.30 per m3 (i.e. Rs. 15.00 per 100 cft.), as per Govt. notification, which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses. | - | Cum | 361.47 | - | 5 |
| 6 | Supplying to site empty cement polythene bags (capacity 50 kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Polythene bag. | 1,138 | Each | 7.15 | ₹8,136.7 | 6 |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 Cum/bag. | 1,138 | Each Bag | 8.34 | ₹9,490.92 | 7 |
| 8 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 1,138 | Each Bag | 3.58 | ₹4,074.04 | 8 |
| 9 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @ 20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. | 105 | Sqm. | 520.82 | ₹54,686.1 | 9 |
| 10 | Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc.complete as per the direction of the Engineer-in-charge | 30 | Kg. | 90.58 | ₹2,717.4 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
WB_2911.pdf
Tender Documents • 1.86 MB
BOQ_2526153.xls
BOQ • 0.38 MB
Image_001.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid