Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC | ₹23.0 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹27.2 L+₹4.1 L (17.9%)Rejected-AOC | ₹27.2 L+₹4.1 L (17.9%) | L2 | Rejected-AOC Second lowest bidder |
Tender Value
₹29.4 L
EMD Value
₹50,000
Closing Date
4 Sept 2020, 6:00 pmClosed
District Soil Conservation Officer, Thrissur
Civil Station, Ayyanthole, Thrissur-680003
Flood control works
2020_DSSC_377912_1
DSC(3) 1027/2020
Open Tender
Civil Works - Others
Item Rate
365 days
kadangode
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
online
₹50,000
20 Nov 2020
20 Aug 2020
7 Sept 2020
20 Aug 2020
4 Sept 2020
20 Aug 2020
20 Aug 2020 - 4 Sept 2020
Amount
RKI 2020-2021-FLOOD CONTROL IN KADANGODU PANCHAYATH - SEETHAR THODU RENOVATION (900 m).
1 a EARTHWORK Deepening and Widening of Seethar Thodu (2137.50 cu.m.)
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soilcharges etc complete
1 b GEO TEXTILES.
2.28.1 Surface dressing of the ground including removing and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lead upto 1.50 m. All kind of soil. Trimming and dressing.
od148212020 2021 Geo textile for protecting earth surface
RETAINING WALL 1.50 m Height (200 m)
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soilcharges etc complete
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil.
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams girders bressumers and cantilevers
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Jojo Louis
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_536536.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .